Info/Illustration
Action
xx0300000142
Move the upper arm into a resting position
against the lower arm.
Lock the upper arm in this position with se-
curing slings around the lower and upper arm
(A), as shown in the figure to the right.
Note!
If the arms are not properly secured,
the upper arm may move during the lift and
cause a drop of the complete arm system.
5
Note!
The figure shows the IRB 4400.
Unload the weight of the arm system with
lifting slings and a crane.
6
Detailed in section
.
Remove the balancing device.
7
Detailed in section
lel arm / Replacement of bearing on
page 194
.
Remove the parallel arm.
8
Shown in the figure
Remove the
attachment screws and friction
washers, lower arm
.
9
Lift away the complete arm system.
Make sure the upper and lower arm are
properly secured to each other during the lift.
10
Refitting, complete arm system
The procedure below details how to refit the complete arm system to the robot.
Info/Illustration
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply (do not turn off
for Foundry Prime robots!)
to the robot, before entering the robot
working area.
1
Continues on next page
158
Product manual - IRB 4400
3HAC022032-001 Revision: Q
© Copyright 2004-2018 ABB. All rights reserved.
4 Repair
4.3.3 Replacement of complete arm system
Continued
Summary of Contents for IRB 4400/60
Page 1: ...ROBOTICS Product manual IRB 4400 ...
Page 8: ...This page is intentionally left blank ...
Page 94: ...This page is intentionally left blank ...
Page 282: ...This page is intentionally left blank ...
Page 294: ...This page is intentionally left blank ...
Page 296: ...This page is intentionally left blank ...
Page 302: ......
Page 303: ......