Required equipment
Note
Art. no.
Spare part no.
Equipment, etc.
3HAC025713-001
Motor unit, axis 2
Always fit a new one!
3HAB3772-1
O-ring
3HAB3676-1
Gasket
3HAB7887-1
Measuring tool, motor
24 VDC, max. 1.5 A. For re-
leasing the brakes.
Power supply
The content is defined in
the section
.
Standard toolkit
Complete kit that also in-
cludes operating manual.
3HAC15716-1
Calibration Pendulum
toolkit
These procedures include
references to the tools re-
quired.
Other tools and procedures
may be required. See refer-
ences to these procedures
in the step-by-step instruc-
tions below.
See the chapter
Circuit Diagram
Removal, motor axis 2
The procedure below details how to remove the motor, axis 2.
Note/Illustration
Action
DANGER
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
1
Shown in the figure
.
Remove the
cover
of the connection box.
2
xx0200000401
Disconnect the motor connectors R3.MP2 and
R3.FB2.
3
•
A: R3.MP2
•
B: R3.FB2
•
C: Connection box
Remove the connection box by unscrewing its
three attachment screws and plain washers.
4
Use a marker pen to mark out the position of the
motor, if the same motor is to be refitted.
5
Continues on next page
188
3HAC026048-001 Revision: E
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.7.2 Replacement of motor, axis 2
Continued
Summary of Contents for IRB 260
Page 1: ...ABB Robotics Product manual IRB 260 ...
Page 8: ...This page is intentionally left blank ...
Page 52: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 214: ...This page is intentionally left blank ...
Page 216: ...This page is intentionally left blank ...
Page 260: ...This page is intentionally left blank ...
Page 266: ......
Page 267: ......