4.2 General procedures
4.2.1 Performing a leak-down test
General
After refitting any motor and gearbox, the integrity of all seals enclosing the gearbox
oil must be tested. This is done in a leak-down test.
Required equipment
Note
Art. no.
Equipment, etc.
3HAC0207-1
Leakdown tester
-
Leak detection spray
Procedure
Note
Action
Finish the refitting procedure of the motor or gear in
question.
1
Art. no. is specified in
.
Remove the topmost oil plug on the gear in question
and replace it with the
leakdown tester
.
Adapters, which are included in the leakdown tester
kit, may be required.
2
Correct value:
Apply compressed air and raise the pressure with
the knob until the correct value is shown on the
manometer.
3
0.2 - 0.25 bar (20 - 25 kPa)
Disconnect the compressed air supply.
4
If the compressed air is signific-
antly colder or warmer than the
gearbox to be tested, a slight
pressure increase or decrease
may occur. This is quite normal.
Wait for approx. 8-10 minutes. No pressure loss may
be detected.
5
Was any pressure drop evident?
6
Localize the leak as detailed below.
Remove the leakdown tester and refit the oil plug.
The test is complete.
Spray suspected leak areas with
leak detection spray
.
Bubbles indicate a leak.
7
When the leak has been localized, take the necessary
measures to correct the leak.
8
112
3HAC026048-001 Revision: E
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.2.1 Performing a leak-down test
Summary of Contents for IRB 260
Page 1: ...ABB Robotics Product manual IRB 260 ...
Page 8: ...This page is intentionally left blank ...
Page 52: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 214: ...This page is intentionally left blank ...
Page 216: ...This page is intentionally left blank ...
Page 260: ...This page is intentionally left blank ...
Page 266: ......
Page 267: ......