![ABB IRB 260 Product Manual Download Page 128](http://html.mh-extra.com/html/abb/irb-260/irb-260_product-manual_5037128.webp)
4.4 Upper arm
4.4.1 Replacement of shaft and bearings, tilthouse
Location of shaft and bearings
The tilthouse is located in the front part of the upper arm, linked to the upper arm
with a shaft, as shown in the figure below.
A more detailed view of the component and its position may be found in section
Upper arm, exploded view on page 254
in part 2 of the Product manual.
xx0500002566
Shaft, tilthouse
A
Tilthouse
B
Sealing ring
C
Taper roller bearing (2 pcs)
D
Sealing ring with dust lip
E
Lock nut (2 pcs)
F
Protection hood (2 pcs)
G
VK cover (2 pcs)
H
M6 screws, including washers (4 pcs)
I
Continues on next page
128
3HAC026048-001 Revision: E
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.4.1 Replacement of shaft and bearings, tilthouse
Summary of Contents for IRB 260
Page 1: ...ABB Robotics Product manual IRB 260 ...
Page 8: ...This page is intentionally left blank ...
Page 52: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 214: ...This page is intentionally left blank ...
Page 216: ...This page is intentionally left blank ...
Page 260: ...This page is intentionally left blank ...
Page 266: ......
Page 267: ......