18
Installation and maintenance guide
1ZSC000563-AAX EN, REV. A, 2019-03-21
4.3.2 Removing transport container and outer terminal
Procedure for removing transport container and outer terminal
1.
Make sure that the crane can lift the bushing. Refer to net weight in the packing list.
2.
Attach soft lifting slings arround the transport
container to the crane hook.
G004204
3.
Remove the transport container.
NOTE!
Be carefull not to damage the
condenser core when removing the
transport container.
G004185
4.
Remove the M10 bolts (8) and washers (9), and
then remove the outer terminal (7).
NOTE!
Keep the outer terminal (7), bolts (8)
and washers (9), they will be used
again.
G003143
End of instruction
Summary of Contents for GSC 200
Page 40: ...40 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 48: ...48 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...