3.4 Lifting
3.4.1 Lifting the transport box
Overview
G004200
1
Center of gravity
2
Soft lifting slings
3
Forklift lifting points
Procedure
1.
Make sure that the crane and the soft lifting slings are approved for the total weight of the transport
box and bushing. Refer to the weight in the packing list.
2.
Attach soft lifting slings (2) to the designated locations.
NOTE!
There are markings on the transport box were to place the soft lifting slings.
3.
Make sure that the angle of the soft lifting sling does not exceed 20°.
4.
Carefully lift the transport box.
5.
Set down the transport box on a flat surface.
End of instruction
Summary of Contents for GSC 200
Page 40: ...40 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 48: ...48 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...