Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
55
7 Re-packing
7.1 Removal of the bushing from the transformer, fixed bottom contact
Procedure
1.
Install the lifting tool, refer to
Installation of lifting tools,
page
2.
Remove the end shield:
1.
Push the end shield carefully against the
pressing ring (17).
2.
Turn the end shield approximately 20°, and
lower it.
G006348
3.
Remove the winding cables from the bottom
contact.
G006212
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......