Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
35
4.
Install the bolts and washers. Tighten the bolts in
a crosswise sequence.
•
When installing the bushing at site, make
sure that the marking (16) on the bushing
flange lines up with the marking on the
transformer turret.
G005108
Torque
Refer to the transformer manufacturers
documentation.
5.
Install the draw-rod nut (10):
1.
Apply a generous quantity of Molykote to the
nut (10), and the threads of the draw rod.
2.
Install the washer (11) and nut (10) on the
draw rod, tighten with your fingers.
3.
Remove excess Molykote with a rag.
CAUTION!
If the nut (10) is not lubricated correctly,
it will not be tighten to the correct
torque. This can cause the bushing to
fail.
G005109
6.
Tighten the draw-rod nut (10).
G005093
Torque
10 Nm
7.
Remove the pull-through cord (12).
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......