18
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
3.
Attach a soft lifting sling to the condenser core (1)
and then to the crane hook.
G006857
4.
Attach a soft lifting sling to the condenser core (1)
and then to the crane hook.
G005085
5.
Carefully lift the bushing.
6.
Lower the bushing onto soft bedding.
End of instruction
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......