24
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
5.
Lower the bushing onto the transformer.
G005106
6.
When installing the bushing at the transformer
factory:
1.
Make sure that the bushing is installed in the
correct orientation.
2.
Make permanent markings (16) on the
bushing flange and the transformer turret.
G005107
7.
Install the bolts and washers. Tighten the bolts in
a crosswise sequence.
•
When installing the bushing at site, make
sure that the marking (16) on the bushing
flange lines up with the marking on the
transformer turret.
G005108
Torque
Refer to the transformer manufacturers
documentation.
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......