REPAIR AND REPLACEMENT
REPLACEMENT PROCEDURES
8 - 4
Tools Required:
Flat-tip screwdriver.
1. Transfer the positioner from automatic to manual operation
(
2.
Remove the positioner cover by removing the two cover screws.
3.
Carefully unhook the ends of the valve clip (Item 5). Remove the
valve clip from the valve body. Remove the valve stem (Item 3) from
the lower end of the valve body.
4.
Remove the two pilot valve screws (Item 52) securing the valve
body and lift the valve body off the housing.
5.
Replace the O-rings. Clean the O-ring grooves and apply Dow
Corning No. 4 or equivalent lubricant to the O-rings.
6.
Set the (replacement or clean) valve body in place.
7.
Secure the valve body by replacing and tightening the pilot valve
screws to 2.6,
±
0.2 Nm (23,
±
2 in.-lbs).
8.
Make certain the valve stem is clean. Install the valve stem.
9.
Install the valve clip.
10. Transfer the positioner back to automatic operation (
).
11. Perform the procedure outlined in
.
I/P Converter
NOTES:
1.
Refer to
for I/P converter part numbers.
2.
Item numbers in this procedure reference Figure
.
3.
This procedure only applies to Type AV2 positioners.
Tools Required:
•
Flat-tip screwdriver.
•
T15 Torx.
•
Pliers.
1. Transfer the positioner from automatic to manual operation
(
2.
Remove the positioner cover by removing the two cover screws.
3.
Remove the two wires that connect the I/P converter (Item 80) to
the termination assembly (Item 59).
4.
Loosen the three screws (Item 58) securing the I/P bracket.
Summary of Contents for AV1
Page 24: ......
Page 42: ......
Page 51: ...CALIBRATION TROUBLESHOOTING CALIBRATION ADJUSTMENTS 4 9 Figure 4 7 I P Adjustment T00779A ...
Page 52: ......
Page 60: ......
Page 70: ...REPAIR AND REPLACEMENT PILOT VALVE STROKE ADJUSTMENT 8 10 ...
Page 88: ......
Page 108: ......
Page 116: ......
Page 124: ...Index 4 Index continued Zero suppression 4 4 Zero suppression 4 4 Graph 4 4 ...
Page 125: ......