Installation
54
Lead the control cables through the lead-through plate:
1. Cut holes in the grommets to fit them tightly onto the control cables.
2. Lead the control cables through the lead-through plate and slide the grommets onto the cables.
Terminal
A
B
A
B
hole 1
hole 2
hole 3
hole 1
hole 2
hole 3
mm
mm
mm
mm
in.
in.
in.
in.
Frame size R8
U1
432
387
342
40
17.0
15.2
13.5
1.6
V1
148
5.8
W1
264
10.4
U2
284
239
194
40
11.2
9.4
7.6
1.6
V2
148
5.8
W2
264
10.4
UDC- 136
91
46
40
5.4
3.6
1.8
1.6
R-
148
5.8
UDC+/R+
264
10.4
PE terminal hole
1
2
3
4
5
6
7
8
9
C / mm [in.]
24 [0.9] 56 [2.2] 88 [3.5] 120 [4.7] 152 [6.0] 184 [7.2] 216 [8.5] 248 [9.8]
280 [11.0]
Frame size R8
64605569
PE
Summary of Contents for ACS800-02
Page 1: ...ACS800 Hardware Manual ACS800 02 Drives 45 to 500 kW ACS800 U2 Drives 60 to 600 HP ...
Page 4: ......
Page 10: ...Safety instructions 10 ...
Page 20: ...About this manual 20 ...
Page 26: ...The ACS800 02 U2 26 ...
Page 42: ...Planning the electrical installation 42 ...
Page 76: ...Installation checklist 76 ...
Page 106: ...Technical data 106 ...
Page 108: ...Dimensional drawings 108 Frame size R7 US gland conduit plate 64579746 H ...
Page 109: ...Dimensional drawings 109 Frame size R8 3AFE 64564161 D US gland conduit plate ...
Page 110: ...Dimensional drawings 110 Frame size R7 with enclosure extension bottom entry 64625942 1 2 B ...
Page 111: ...Dimensional drawings 111 64625942 2 2 C ...
Page 112: ...Dimensional drawings 112 Frame size R7 with enclosure extension top entry 64626264 1 2 C ...
Page 113: ...Dimensional drawings 113 64626264 2 2 C ...
Page 115: ...Dimensional drawings 115 3AFE 64626388 2 2 B ...
Page 116: ...Dimensional drawings 116 Frame size R8 with enclosure extension top entry 3AFE 64626370 1 2 C ...
Page 117: ...Dimensional drawings 117 3AFE 64626370 2 2 C ...
Page 118: ...Dimensional drawings 118 ...
Page 127: ......