Section 2 Installation
Prefabricated aluminum profile
3BSE036351-510 A
71
3.
When the interconnection is complete, rotate the locking device clockwise to
the
LOCKED
position (3). The PM891 unit is now fully locked into the
position and has a good ground connection to the DIN-rail.
It is essential that the locking device be placed in the
LOCKED
position to
avoid possible problems caused by vibration and/or intermittent grounding.
Figure 20. Unit locking for PM891
Figure 21. PM891 with other units mounted on DIN-rail
1.
OPEN
2.
SLIDE
3.
LOCKED