background image

®

Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468

 Toll Free: (800) 523-5471  Phone: (610) 825-6565

www.aaesports.com

10'-0"

120"

from

Ground

Level

Debris Ring

(Optional)

If not present

Make sure

lower collars

are positioned

accordingly.

Net Pulley 

System

Right

View

Post Cap

pre-installed

3'-6"

42"

(REF)

+

Height

of

Fence

or

Wall

Front

View

Corner Post Vertical 

Cable needs to be 

run in front of net.

Do Not Secure to 

Lower Vertical 

Tensioner until net 

has been raised 

and fully tensioned.

Cleat

Detail

6

10

7

1

9

9

Apply 

supplied 

Anti-Seize 

to bolt 

threads

Eyebolt

Detail

3

4

5

Apply supplied 

Anti-Seize to bolt 

threads

Open

Eyebolt Collar

Detail

  40.00°  

Cleat

(for positional ref)

Warning

Label

AAE I.D.

Label

Installation Notes:

Lower Collar(s):

 From bottom of pole slide the 

1.

lower horizontal collar and and debris ring 

(

optional

) into position. To allow proper 

insertion into ground sleeve, lower most collar 

should be 42" + Height of Wall/Fence from end 

of post. 

Before securing collars into place verify 

correct orientation.

 (

refer to diagram

)

Cleat:

 Is to be installed so that it is on backside 

2.

of post, opposite net. Screws will be inserted 

through post and cleat and secured on opposite 

of net side using self locking hex-nuts and cap 

nuts. (

refer to diagram

)

Mid Collar Open Eyebolt: 

Note orientation of 

3.

collar on post. From top of pole slide the open 

eyebolt collar into position (

refer to diagram

and secure into place.

Mid Collar with Shackle: 

Note orientation of 

4.

collar on post. From top of pole slide the open 

eyebolt collar into position (

refer to diagram

and secure into place.

Eyebolt:

 Pulley system comes preassembled to 

5.

eyebolt. Install washer onto eyebolt then insert 

eyebolt with washer through front side of hole at 

top of post. From  opposite side secure eyebolt 

into place using a flatwasher and self-locking 

hex-nut. (

refer to diagram

)

Upper Collar:

 From top of pole slide the upper 

6.

vertical cable collar into position (collar should 

rest on eyebolt washers). 

Before securing 

collars into place verify correct orientation

(

refer to diagram

)

Make sure warning labels are present on goal 

7.

posts.

Note:

Post assembly should be 

done with post laying down 

on flat level surface.

Note: Collars are Black in color, 

shown in different colors to aid in 

identification.

Anti-Seize

(supplied by AAE

Collar Orientation

Detail

(Note: 

ONLY

 vertical cable 

collars should be turned away 

from netting, this aids in 

tensioning the net)

BBS-25/FA & /WA

Assembly Instruction

Right Corner Post

17 of 25

Summary of Contents for BBS-25

Page 1: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com 1 of 25 BBS 25 25 High Baseball BackStopper System Specification ...

Page 2: ...lines for Placement Distance Total Length of 3rd Base Run Specified by Customer 20 240 Max Distance Between Uprights Total Number of Uprights Total Length of 1st Base Run Specified by Customer 20 240 Max Distance Between Uprights Total Number of Uprights Notes Total number of Uprights per run 1 is determined by dividing the runs length evenly with the resulting sections not exceeding 20 on center ...

Page 3: ...e Collar Black Vinly Coated Galvanized Steel Net with Integrated Clear Vinly Coated Galvanized Steel Cable Heavy Duty Braided Nylon Rope Black Cable Clamp Galvanized Steel Pear Clip Stainless Steel O Ring Brass Eyebolt Stainless Steel Hanging Pulley Galvanized Steel Vertical Cable Vinyl Coated Galvanized Steel BBS 25 Specifications Net AAE N361 36 1 3 4 sq knotted Nylon DBB length to vary 1 4 MFP ...

Page 4: ...ngth 3 6 42 to Stop Bolt Crushed Stone C o n c r e t e C o n c r e t e No Drainage Taper Custom Sleeve Footing Post In Wall Specification Notes If system is an in wall installation than 1 height of wall is deducted from net height to ensure proper tension is attained on net when raised i e 20 High system with 3 High backstop wall would have a net height of 17 A B C D DRAWN BY CAD FILE MODEL DATE N...

Page 5: ...able Pear Clip Collar Assembly 31 30 32 34 33 Apply Supplied Anti Seize to bolt threads 30 36 35 34 33 Vertical Cable Open Eyebolt Collar Assembly Apply Supplied Anti Seize to bolt threads Horizontal Cable Shackle Collar Assembly 31 33 34 30 37 Apply Supplied Anti Seize to bolt threads 31 30 33 34 Apply Supplied Anti Seize to bolt threads Note Collars are Black in color shown in different colors t...

Page 6: ...ement at each end and in corners if run is not straight i e backstop Cable Tie 6 Spacing Net Offset Rope Border Attachment Cable Small Eyebolt used to hold down cable 4 Spacing Attachment Cable Cable Tie 6 Spacing Net Offset Rope Border Note Pre Fab Approval form will need to be filled out prior to making the system where wall fence heights length of net and attachment style will need to be specif...

Page 7: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 FA Parts List 7 of 25 ...

Page 8: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 WA Parts List 8 of 25 ...

Page 9: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 SA Parts List 9 of 25 ...

Page 10: ... sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that it is on 2 backside of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using Nylock hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation 3 of collar on post From top of pole slide the open eyebolt collar into position ...

Page 11: ... place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that it is on 2 backside of post opposite net Screws will be inserted through post and cleat and secured on net side using Nylock hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation 3 of collar on post From top of pole slide the open eyebolt collar into position r...

Page 12: ...ntation refer to diagram Cleat Is to be installed so that it is on backside 2 of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar with Pear Clip Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into pla...

Page 13: ...rrect orientation refer to diagram Cleat Is to be installed so that it is on backside 2 of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar with Pear Clip Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secur...

Page 14: ...opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place...

Page 15: ...osite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Ey...

Page 16: ...te net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation of 4 collar on post From top of pole slide the ope...

Page 17: ...d through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation of 4 collar on post From top of pole slide the open eyebolt collar into positio...

Page 18: ...and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position and rotate approx 45 cl...

Page 19: ...ecured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position and rotate approx 45 clockwi...

Page 20: ...s into place if applicable Installation Notes View above is from net side of post field of 1 play Caution slowly lower posts into sleeves 2 Dropping post into sleeve may result in damage to the stop bolt Make sure all posts are orientated correctly 3 Pulley system towards field of play and cleet away from field of play All lower horizontal cable collars should face field of play Once posts are cor...

Page 21: ... using an anchor 2 shackle Route cable to Left End Post Snap cable into Pear Clips of the Inner 3 Posts along the way and route inside of shackle on Corner Posts Before assembling Clamped Cable Loop End fully open the 4 turnbuckle With anchor shackle and thimble inplace run cable thru the shackle as 5 shown Pull slack out of cable and mark vinyl sleeve approximately 4 from thimble end Strip vinyl ...

Page 22: ... Crimped Cable End to Right End Post Large Eyebolt using an 2 anchor shackle Route cable to Left End Post Make sure to route cable thru Small 3 Large Eyebolts installed to top of wall Before assembling Clamped Cable Loop End fully open the 4 turnbuckle With anchor shackle and thimble inplace run cable thru the shackle as 5 shown Pull slack out of cable and mark vinyl sleeve approximately 4 from th...

Page 23: ...nd they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has been co...

Page 24: ...st and they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has bee...

Page 25: ...d they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has been com...

Reviews: