®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
+
Height
of
Fence
or
Wall
10'-0"
120"
from
Ground
Level
Net Pulley
System
Right
View
Post Cap
pre-installed
Cleat
Detail
6
10
7
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to
bolt threads
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Note: Collars are Black in color, shown
in different colors to aid in identification.
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Open
Eyebolt Collar
Detail
40.00°
90.00°
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting)
Cleat
(for positional ref)
Warning
Label
AAE I.D.
Label
Installation Notes:
Lower Collar(s):
From bottom of pole slide
1.
the lower vertical cable collar, lower
horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most
collar should be 42" + Height of Wall/Fence
from end of post.
Before securing collars into
place make sure to rotate the lower vertical
collar approx 40°.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will be
inserted through post and cleat and secured
on net side using Nylock hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar Open Eyebolt:
Note orientation
3.
of collar on post. From top of pole slide the
open eyebolt collar into position (
refer to
diagram
) and secure into place.
Mid Collar Tensioner:
Note orientation of
4.
collar on post. From top of pole slide the
open eyebolt collar into position and , rotate
approx 45° counterclockwise (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes preassembled
5.
to eyebolt. Install washer onto eyebolt then
insert eyebolt with washer through front side
of hole at top of post. From opposite side
secure eyebolt into place using a flatwasher
and self-locking hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position (collar
should rest on eyebolt washers). Before
securing into place make sure to rotate the
collar clockwise, approx 40°. (
refer to
diagram
)
Make sure warning labels are present on goal
7.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Anti-Seize
(supplied by AAE
BBS-25/FA & /WA
Assembly Instruction
Left End Post
11 of 25