12.7
Menu structure
CONTROL
SERVICE
PROGRAM
MAIN MENU
HYSTERESE
OFF
HYSTERESE DOWN
ON
HISTORY
OF ERRORS
START OPERATION
CHANGE SETPOINT
APPLIANCE
HISTORY
WEEK-
PROGRAM
SELECT
APPLIANCE
START OPERATION
SERVICE INTERVAL
PROGRAM
OVERVIEW
SERVICE
OPERATION
EXTRA PERIOD
FULL LOAD
PARTIAL LOAD
SETTINGS
LANGUAGE
ANTI LEGIONELLA
DAY/TIME
SOLAR
CONFIGURATION
SPECIFICATIONS
DRAIN BACK
REGULATION INTERVAL
TEST SOLAR PUMP
IGNITION SPEED
SOLAR LIMIT
TEMEPRATURE
SOLAR DIFFERENCE
WORKING SPEED
CONTRIBUTION
Q/T-SENSOR
TEMPERATURES
HEATING
CONFIGURATIONS
HEATING SETPOINT
HEATING CONNECTED
120
Installation, Maintenance and Service part
Summary of Contents for SGS-28
Page 6: ...6 ...
Page 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13 ...
Page 14: ...14 ...
Page 16: ...16 User part ...
Page 18: ...18 User part ...
Page 24: ...24 User part ...
Page 40: ...40 User part ...
Page 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41 ...
Page 42: ...42 User part ...
Page 82: ...82 Installation Maintenance and Service part ...
Page 90: ...90 Installation Maintenance and Service part ...
Page 104: ...104 Installation Maintenance and Service part ...
Page 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part ...
Page 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part ...
Page 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121 ...
Page 124: ...124 Installation Maintenance and Service part ...
Page 126: ...126 Installation Maintenance and Service part ...