E1
Errata
The amendments below apply to finishing of maintenance (15.5 "Finalizing maintenance").These instructions supersede
the previous instructions of the solar heating control.
15.5 Finalizing
maintenance
To finalize the maintenance, carry out the following steps:
1. Fill the water heater (5 "Filling").
2. Start the water heater (9 "Starting the water heater").
3. Check the CO
2
value (3.12.3 "CO
2
adjustment").
4. Check the switching pressure of the pressure switch. (3.12.4 "Switching pressure
measurement")
5. Erase the message SERVICE REQUIRED. The displayed message can be reset in
either of two ways.
1. Temporary reset:
To postpone the message, press RESET once. The message will reappear on the
display 7 days later.
2.Full reset:
To fully reset the message, press and hold both RESET and ENTER at the same
time for 5 sec.
On completion of the full reset of the message, the message below will appear on the
display. This message will NOT be shown after a temporary rest of the message.
Summary of Contents for Cyclone BFC-28
Page 4: ...E2...
Page 6: ...4 Instruction manual BFC gis...
Page 10: ...Contents 8 Instruction manual BFC...
Page 31: ...Instruction manual BFC 29 is Installation types IMD 0789 R0 C43 C13 C53 B23 C33...
Page 48: ...Conversion to a different gas category 46 Instruction manual BFC 4 is...
Page 58: ...Status of the water heater 56 Instruction manual BFC 8 gis...
Page 62: ...Shutting down 60 Instruction manual BFC 10 gis...
Page 74: ...Service program 72 Instruction manual BFC 12 is...
Page 88: ...Service interval 86 Instruction manual BFC 14 is...
Page 97: ...Instruction manual BFC 95 is...
Page 102: ...Instruction manual BFC 100...