Use the service menu to switch the pump on (see section 9.2.8.2).
Note
To ensure that the solar heating system is properly filled, the pump in the solar heating
system can be switched on for 2 minutes using the service menu.
Repeat steps 6 through 9 until glycol runs out of the air bleed (26).
Note
If an installation does not have a drain-back system, then it should be filled up to
pressure (1.5 bar).
If an installation does have a drain-back system, then it should not be pressurised. For
the installation, filling and drainage of a drain-back system, please refer to the installation
manual and users manual of the solar collectors.
Switch off the glycol pump.
Close the valve of the inlet combination and disconnect the glycol pump (including
the hoses).
Note
Dispose of the residual glycol in the filler hose in an environment-friendly manner, and
according to local regulations.
7.9.2
Procedure for checking the supply pressure
To check the supply pressure, proceed as follows:
Isolate the appliance from the power supply (see section 4.2.2).
Carefully remove the covers from the appliance.
The electrical section is now visible.
SGS 28 to 60
There is a test nipple before the gas control valve (for natural gas appliances) or
before the pressure-reducing valve (for LPG appliances) so that the supply pressure
can be measured.
This test nipple has a sealing screw. Loosen the sealing screw by a few turns. Do not
completely loosen it as it can be difficult to retighten.
IMD-1095a R0
IMD-1096a R0
SGS 80 to 120
The gas control valve has a test nipple that can be used for measuring the supply
pressure.
This test nipple has a sealing screw. Loosen the sealing screw by a few turns. Do not
completely loosen it as it can be difficult to retighten.
10.
n
11.
12.
13.
1.
2.
3.
4.
5.
72
Installation, Maintenance and Service part
Summary of Contents for BFC-120
Page 6: ...6...
Page 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13...
Page 14: ...14...
Page 16: ...16 User part...
Page 18: ...18 User part...
Page 24: ...24 User part...
Page 40: ...40 User part...
Page 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41...
Page 42: ...42 User part...
Page 82: ...82 Installation Maintenance and Service part...
Page 90: ...90 Installation Maintenance and Service part...
Page 104: ...104 Installation Maintenance and Service part...
Page 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part...
Page 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part...
Page 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121...
Page 124: ...124 Installation Maintenance and Service part...
Page 126: ...126 Installation Maintenance and Service part...