background image

Club ToasTer CTX-200l

9

P/N 1011038 06/09 

McDonald’s

Purging Products from the toaster

During normal operation, if it ever becomes necessary 

to purge a product from the toaster, follow these steps:

  1.  While in Ready or Wait mode, press and hold the 

NeXt

 button until the product have been purged 

from the unit. This will speeds the unit up, forcing 

the product out of the toaster.

  2.  Once the product is purged, release the 

NeXt

 

button and the unit will return to normal operating 

speed.

Note: Product is always purged out of the front of 

the toaster using the NeXt button.  It is Not pos-

sible to purge product backwards through the unit.  

only the NeXt button will purge product.

shutting down the CtX-200l

Follow these steps to shut down the toaster:
  1.  Turn the power off. 
  2.  The fans continue to run and the display reads:

 

  OK to Clean 

45 minutes Remaining

  3.  The Cool Down mode will continue for 45 min-

utes, counted down on the display, and the unit 

will shut down automatically when complete.

Note: If the unit requires any internal maintenance, 

be sure to completely shut down the unit. 

oPeratIoN (continued)

WarNING

to avoid possible personal injury and/or dam-

age to the unit, all inspections, tests, and repair 

of electrical equipment should be performed 

by QualIfIed serVICe PersoNNel. the unit 

Must be completely shut down and unplugged 

before performing any internal service, except 

when electrical tests are required. use extreme 

care during electrical circuit tests. live circuits 

will be exposed.

IMPortaNt

do Not unplug the power cord when the unit is 

in cool down mode. Wait for the 45-minute cool 

down period to complete before unplugging the 

power cord.

reset to factory defaults

Inadvertent changes to the settings of the CTX-200L 

could affect how the unit operates.  If a fault message 

appears, it is recommended that you first attempt to 

restore the settings to the factory defaults. This will 

restore all settings and parameters to McDonald’s  

corporate specifications. 

Note: the CtX-200l should Not be unplugged  

during normal operation or during the 45-minute 

cool down period.

Follow these steps to reset the Factory Defaults:

  1.  Turn the power off. 

  2.  Turn the power on.

  3.  Listen for the unit to click three times, then imme-

diately press and hold the 

PreV

 and 

NeXt

 but-

tons until the display reads 

Factory Defaults 

Set

.

Note: the display will then go blank.

  4.  Turn the power off and then back on.

  5.  Wait for the 20-second countdown to complete.

Note: the unit will then display 

Muffin Wait

.

  6.  Preheat the unit and test for proper operation.

Note: If after resetting the factory defaults the 

unit continues to display a fault/error message, turn 

the power off and unplug the power cord. Wait a 

few seconds and then plug the power cord back in. 

then repeat steps 2 through 6. If the unit still dis-

plays a fault/error message, immediately call your 

authorized service agency for assistance.

Changing the display language

Follow these steps to change the display language 

between English and French:

  1.  At any time during power off (but connected to 

power), cool down, warm-up, or normal operation, 

press the 

seleCt

 button.

  2.  Press the 

NeXt 

button to select the desired  

language and then release the button.

  3.  After 3 seconds, the change is stored into  

memory.

Summary of Contents for CTX-200L

Page 1: ...itness for a particular pur pose each of which is expressly disclaimed The remedies described above are exclusive and in no event shall A J Antunes Co or any of its Divisions be liable for special con...

Page 2: ...manual and fill in the information below Authorized Service Agency Name Phone No Address Use only genuine Roundup replacement parts in this unit Use of replacement parts other than those sup plied by...

Page 3: ...y cord plug If it does not fit the outlet have a proper outlet installed by a qualified electrician Do NOT use an extension cord with this appliance Check with a qualified electrician if you are unsur...

Page 4: ...ter may include the use of chemical products These chemical products will be highlighted with bold face let ters followed by the abbreviated HCS Hazard Communication Standard See Hazard Communication...

Page 5: ...e walls and materials Failure to maintain safe oper ating distances may cause discoloration or com bustion Caution All electrical connections must be in accordance with local electrical codes and any...

Page 6: ...d 2 Installation continued Figure 2 Club Toaster Accessories and Placement Bun Feeder Can be installed to the right or the left side of the toaster depending on placement of both the UT and CT toaster...

Page 7: ...cate Club Route Through toaster Toasting Clubs Follow these steps to toast clubs with the Club Toaster 1 Make sure the unit is turned on and that the display reads Ready 2 Insert the club into Bun Fee...

Page 8: ...NEXT buttons while the value is blinking to change adjust the setting Note Do NOT change any of these settings for ANY reason For assistance in changing these options please call the factory 6 When y...

Page 9: ...power cord when the unit is in cool down mode Wait for the 45 minute cool down period to complete before unplugging the power cord Reset to Factory Defaults Inadvertent changes to the settings of the...

Page 10: ...down Personal injury and burns may result from touching the unit before it is finished cooling down NOTE If at any time the unit displays an error message or if it fails to operate properly contact th...

Page 11: ...McD All Purpose Super Concentrate APSC HCS 5 Next sanitize the Belt Wrap by wiping it with a clean towel dampened with KAYQUAT II Sanitizer HCS 6 Press CT to rotate the Belt Wrap to expose the unclea...

Page 12: ...s a cool down mode and dis plays OK to Clean The fans continue to run This cool down period continues for 45 minutes and shuts the unit down automatically when com plete NOTE You do NOT need to wait f...

Page 13: ...e 10 3 Install the front Belt Wrap around the top front roller with the Connecting Pin towards the bottom of the unit Figure 12 4 Thread the Belt Wrap through the toaster and pull it around the lower...

Page 14: ...oduct is getting stuck in the conveyor system or the conveyor system is jammed Refer to the Operation and Maintenance sections of this man ual for proper compression settings and cleaning procedures T...

Page 15: ...will shut down Allow the toaster to cool down and restart If this condition persists contact your Authorized Service Agency for service The overtemp thermocouple tempera ture is greater than 350 F or...

Page 16: ...1 12 13 74 71 2 23 23 89 12 56 32 8 10 16 17 Caution To avoid possible personal injury and or damage to the unit all inspections tests and repair of electrical equipment should be performed by QUALIFI...

Page 17: ...ub Toaster CTX 200L 17 P N 1011038 06 09 McDonald s 1 59 36 58 42 83 88 30 28 89 82 76 75 CL UB CL UB 84 84 88 12 10 11 7 29 22 96 79 80 38 38 14 60 48 90 9 16 17 10 8 12 67 Replacement Parts continue...

Page 18: ...91 Retainer Idler Brg 1 2150259 Pin Bearing Idler 1 2150258 Bearing Idler 1 3000124 Ring Retaining 3 8 1 48 0011970 Electrical Panel Assembly 1 49 0021374 Rear Cover Panel Weldment 1 53 4000132 Fan Bl...

Page 19: ...5 14 BTM PLATEN TOP PLATEN J109 24 J109 12 J110 6 J110 5 WHT 4 5 1 2 6 BLU BRN ORG BLU YEL BLK BLK WHT WHT BLU YEL BLK ORG BLK BRN 1uf 250VAC CAP1 RED YEL RED BLK WHT WHT BLK WHT GRN RED YEL WHT BLU...

Page 20: ...Carol Stream Illinois 60188 USA Phone 630 784 1000 Toll Free 800 253 2991 Fax 630 784 1650 Antunes Equipment Manufacturing Suzhou Ltd 9 Hou Ju Road Building 24 S T Park SND Suzhou Jiangsu China 215011...

Reviews: