72
73
1381 Unloading the 3M™ Steri‑Vac™ Sterilizer/Aerator GSX Series – Cycle Complete
Sterilizer
55.0
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:04:01
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle:
Count:
33
GSX 55C
Open door
Show chart
Figure 88
Cycle Complete Screen
1�
Press the
Open Door
button on the touch screen (Figure 88) On double door units, press the
Open Unload Door
button
2�
Allow chamber pressure to equilibrate to room pressure; this typically requires 60‑90 seconds
3�
Open the GSX Series sterilizer door
4�
Remove the load from the chamber Remove the empty 3M™ Steri‑Gas™ EO Gas Cartridge
5�
Press the
Stop
button to generate a printout of the cycle report (Figure 89) The display screen will return to the main screen
6�
Follow the Process Monitoring and Quality Control procedures described in Chapter 14
Sterilizer
22.2
˚
C
98.0
kPa
Stop
Aeration time elapsed (hh:mm):
Cycle complete
0:00
1:00
12:00
Menu
Menu
04/20/2015
21:03:12
Gas expose time elapsed (hh:mm):
Cycle time remaining (hh:mm):
Cycle:
Count:
33
GSX 55C
Open door
Show chart
Figure 89
Command to Obtain Cycle
Report Printout