21
Table 3 – Inspection and Maintenance Log
Serial Number(s):
Date Purchased:
Model Number:
Date of First Use:
Inspection Date:
Inspected By:
Component:
Inspection:
(See Section 2 for
Inspection Frequency
)
Pass
Fail
SRD
(Figure 16)
Inspect for loose fasteners and bent or damaged parts.
Inspect the Housing (A) for distortion, cracks, or other damage.
Inspect the Swivel (B) and Swivel Eye (C) or Integral Connector (D) for
distortion, cracks, or other damage. The Swivel should be attached securely to
the SRL, but should pivot freely. The Swivel Eye or Integral Connector should
rotate freely in the Swivel.
The Web Lifeline (E) should pull out and retract fully without hesitation or
creating a slack line condition.
Ensure the SRD locks up when the Lifeline is jerked sharply. Lockup should be
positive with no slipping.
All labels must be present and fully legible (see Figure 19).
Inspect the entire SRD for signs of corrosion.
End Connectors
(Figure 17)
Table 2 identifies the End Connectors that should be included on your
Nano-Lok SRD model. Inspect all Snap Hooks, Carabiners, Rebar Hooks,
Interfaces, etc. for signs of damage, corrosion, and proper working condition.
Where present: Gates (A) should open, close, lock, and unlock properly
Locking Buttons (B) and Locking Pins (C) should function correctly.
Web Lifeline
(Figure 18)
Inspect webbing; material must be free of cuts (A), frays (B), or broken fibers.
Check for tears, abrasions, heavy soiling (C), mold, burns (D), or discoloration.
Inspect stitching; Check for pulled or cut stitches. Broken stitches may be an
indication that the harness has been impact loaded and must be removed from
service.
Energy Absorber
(Figure 19)
Verify that the integral Energy Absorber has not been activated. An open cover
or torn cover (A), webbing pulled out of the cover (B), torn or frayed webbing
(C), ripped stitching, etc. are indicators of an activated Energy Absorber.
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Corrective Action/Maintenance:
Approved By:
Next Inspection Due:
Date:
Summary of Contents for 3101257
Page 4: ...4 ...
Page 5: ...5 2 E D C A B G F C A B D H C A B B A C D h 3 A B FC FF DD SF FC FF DD SF C FC H ...
Page 7: ...7 7 B D C A 8 ...
Page 8: ...8 9 1 A B B A Delta III ExoFit NEX 2 C C D 3 4 5 A D A ...
Page 9: ...9 10 1 A B 2 C D D 3 F G E 4 A E 5 F E 6 A D C ...
Page 10: ...10 11 1 2 3 4 5 6 7 ...
Page 11: ...11 12 E D A G D B F C F 13 14 A B C 15 ...
Page 22: ...22 ...