1.
It is recommended to submit a Test Build prior to each build job.
7.6 Build Demo
Press
, scroll to highlight
. # Press
on Operators panel; the system displays
. #
MENU
BUILD DEMO
YES
PLATFORM CLEAR? Y/N
When platform is clear, press
. The printer starts demo build job.
YES
08.0 Operations
This section provides information on previewing, saving, submitting, and managing jobs through the printer's operator panel menu and 3-D
Modeling Client Software. In addition this section describes how to remove the build platform, how to empty the waste drawer and how to shut
down the printer.
Make certain the printer is *Off-Line during the job submittal process. Place the printer on-line after the job is submitted.
8.1 Print Preview Overview
8.2 Save a Build Job
8.3 Submit a Build Job
8.4 Manage Build Jobs
8.5 Printer Status
8.6 Empty Waste Drawer
8.7 Shutdown Printer
8.8 Remove Part from Build Platform
Summary of Contents for ProJet 5000
Page 34: ...This view point button is a back two dimensional viewpoint Bottom View ...
Page 36: ...A bounding box for a set of objects is a cuboid that completely contains the set Copy ...
Page 41: ...This view point button is a front two dimensional viewpoint Help Topics ...
Page 45: ...This view point button is a right two dimensional viewpoint Rotate ...
Page 60: ...Using a wire frame allows visualization of the underlying design structure of a part Zoom ...