Installation Manual
H3C S9500 Series Routing Switches
Chapter 3 Installing the Switch
3-16
Note:
z
Put the removed blank filler panel away for future use.
z
The LPUs of the S9500 series are hot-swappable.
3.7.2 Installation Procedure
Follow the procedure below to install an LPU:
1) Turn the ejector levers on the LPU outward simultaneously with both
hands, insert the LPU straight into the chassis along the guide rails
until it stops sliding (that is, the positioning pins on the ejector levers
touch the positioning holes on the chassis).
2) Turn the ejector levers towards the front panel to drive the positioning
pins into the positioning holes.
Figure 3-16
Install an LPU
3) Fix the LPU by fastening the mounting screws on the LPU with a
Phillips screwdriver.
3.8 Installing PoE Power Supply
The S9505/S9508/S9512 uses PSE4500-A as an external PoE power
supply, which is connected to the switch through the PoE power entry
module at the front bottom of the switch to provide power for connected
powered devices (PDs).
The following introduces the installation of PoE power supply on the
S9505.