Installation Manual
H3C S9500 Series Routing Switches
Chapter 3 Installing the Switch
3-2
z
All requirements mentioned in Chapter 2 Preparing for the Installation
have been met.
3.3 Mounting the Switch in a Rack
3.3.1 Preparations
Before installation, make sure that:
z
The cabinet is grounded and stable. The layout inside the cabinet for
switch installation has been well done and there is no obstacle inside
or around the cabinet.
z
The switch is ready for installation and has been carried to a place
near the cabinet.
3.3.2 Installing the Cable Management Bracket and Rack-Mounting
Ears
For your convenience, a cable management bracket is shipped with the
S9500 series. Take the following steps to install the cable management
bracket.
1) Facing the LPU slots of the switch, insert the shipped cable
management bracket into the left rack-mounting ear on which there is
a recessed hole for installing the cable management bracket, and fix it
with screws. (One cable management bracket for the
S9505/S9508/S9508V and two for the S9512).
2) Install the rack-mounting ears onto the both sides of the switch, as
shown in
Figure 3-2
.
Figure 3-2
Install the cable management bracket and rack-mounting ears