Lift Cabin Audio Unit
– Universal
2.2
32
ALARM Button Connection
Requirements
The ALARM button design (colour, symbol, button surface, mechanical run) and
location have to meet the requirements of the particular installation.
Button control
Requirements
The ALARM button has to be equipped with a normally open (NO) or normally
closed (NC) contact that is not connected with any other circuit.
None of the ALARM button terminals may be connected electrically with any
other electrical circuit and a voltage source other than the NO/NC contact.
If one of the ALARM contacts is connected to another circuit, appropriate
isolation strength according to applicable standards has to be ensured
between the contacts.
Instructions
1.
Leave the ALARM terminal in the LOW position (3).
2.
With a normally open contact, leave jumper (12) – right in the default position.
3.
With a normally closed contact, switch jumper (12) – right into the HIGH
position.
Voltage control
Requirements
DC 12 to 48V voltage
The voltage signal has to be active even in the case of power failure.
Instructions
1.
Switch the ALARM terminal by two pins up into position (2).
2.
For activation by voltage connection, leave jumper (12) – right in the default
position.
3.
For activation by voltage disconnection, switch jumper (12) – right into the
HIGH position.
Caution
Jumper setting, as printed on the unit cover of pre-production samples, is
only valid for CANCEL and wrong for ALARM.
See above for the proper setting.
Warning
Ignoring the instructions above may lead to product damage.
Summary of Contents for LiftNet
Page 1: ...2N LiftNet Lift Communicator User Manual Version 1 9 3 Firmware version 1 9 1 www 2n cz ...
Page 3: ...2N LiftNet product is the holder of the Type certificate of the TÜV SÜD Czech company ...
Page 11: ...Product Description 1 1 11 Figure 1 3 Example of Fireman Connection in 2N LiftNet ...
Page 18: ......
Page 54: ......
Page 66: ......
Page 82: ......
Page 86: ...Battery Maintenance 5 1 86 ...
Page 88: ......
Page 92: ......