B. Assembly and Installation
Model AQSync Air Quality Monitoring Station Manual Rev. A-1
7
A. Route the 2 wires on the bottom of the Core into the aluminum flange on the top of
the AQSync, and then slide the rod down into the AQSync a few inches. (The wires
will be connected later.)
B. Insert the bottom of the Core into the receptacle of the PM instrument mounted
inside the AQSync. Twist and push the Core through the o-ring that is inside the
receptacle, until it seats against the bottom of the receptacle.
The PM
measurements will only be valid if the Core is sealed with the o-ring and seated
properly!
C. Insert the Shield Assembly over the Core and down over
the o-ring on the flange. Rest it on the aluminum flange.
D. Line up the holes in the Shield and the flange. Attach
the Shield with three 8-mm screws provided, using the
angled Phillips head screwdriver (also provided).
A
B
o-ring
C-D
holes to
align
D