16 / 61
Identification: MD-AL-GI-00
Rev. 4.0 of 31.01.18 - Application: GID
Manual of 07/06/2019 Rev. 2.1 “User Manual for 1.1K-3K TL”
3.3.
Installation tools
The following tools are required for installation of the inverter and electrical connections; therefore, they
must be prepared before installation.
No.
Tool
Function
1
Drill
Recommended drill bit: 6 mm
To drill holes in the wall for
fixing the bracket
2
Screwdriver
To screw and unscrew screws for
the various connections
3
Wire stripping tool
To prepare the cables for wiring
4
Adjustable spanner (opening
greater than 32 mm)
To tighten the bolts
5
4 mm Allen key
To screw the inverter to the wall-
mounting bracket and to open
the front cover of the inverter
6
RJ45 crimping tool
To crimp the RJ45 connectors for
the communication cables
7
Rubber hammer
To insert the expansion plugs
into the wall holes
8
MC4 removal tool
To remove the DC connectors
from the inverter
9
Diagonal pliers
To cut and tighten the cable ends