![Zte ZXSDR BS8908 G060 Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/zte/zxsdr-bs8908-g060/zxsdr-bs8908-g060_user-manual_940278071.webp)
Chapter 5 Installation
Steps
1.
Bind the cable tie at the bottom of the cable rack corresponding to the environment
monitoring interface MON.
2.
Make the environment monitoring cable pass through the cable tie, tighten it to the
cable rack, and fasten the cable tie.
3.
Remove the protective cap of the environment monitoring interface MON, connect end
A of the environment monitoring cable to the MON interface of BS8908, and fasten the
screw at the interface.
4.
Connect end B of the environment monitoring cable to the external monitoring
equipment or dry contact.
5.
Paste the label at both ends of the cable.
– End of Steps –
5.7.9 Installing AISG Control Cable
Context
The
control cable provides power supply and communication signal between BS8908
system and AISG equipment.
shows the structure of the AISG control cable.
Figure 5-36 AISG Control Cable Structure
1.
Waterproof washer
2.
Fixing block
Steps
1.
Bind the cable tie at the bottom of the cable rack corresponding to the AISG debugging
interface.
2.
Make the AISG control cable pass through the cable tie, tighten it to the cable rack,
and fasten the cable tie.
5-41
SJ-20101104174421-001|20110425(R1.1)
ZTE Proprietary and Confidential
Содержание ZXSDR BS8908 G060
Страница 5: ...Glossary V III ...
Страница 6: ...IV ...
Страница 78: ...Tables This page intentionally left blank ...