5.4.2 Hoisting Operation Precautions
The following lists precautions for hoisting equipment to the tower top:
l
The natural condition for hoisting operation is satisfied, such as no fog and high
visibility. Hoisting operation is prohibited in adverse weather of wind, rain, and snow.
l
Tools for hoisting operation are available, including the hoisting rope (bearing 100 kg)
and the crown block, and the crown block is fixed tightly on the appropriate position
on the tower.
l
Unpack the package to check whether the cabinet is in good condition. If it is, perform
the hoisting operation.
During the hoisting operation, pay attention to the following:
l
Do not bind the hoisting rope on the equipment's handle.
l
Before performing the hoisting operation, check whether the rope is bound tightly and
whether the screws of the installation bracket are fixed firmly.
l
Do not use the steel wire rope as the hoisting rope.
l
To avoid accidents, make sure that there is no personnel left around the tower
(especially under the RRU).
5-11
SJ-20101104174421-001|20110425(R1.1)
ZTE Proprietary and Confidential
Содержание ZXSDR BS8908 G060
Страница 5: ...Glossary V III ...
Страница 6: ...IV ...
Страница 78: ...Tables This page intentionally left blank ...