![Zte ZXSDR BS8908 G060 Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/zte/zxsdr-bs8908-g060/zxsdr-bs8908-g060_user-manual_940278067.webp)
Chapter 5 Installation
Context
The Abis E1 cable provides physical transmission for E1 signal between BS8908 and iBSC
and between cascaded BS8908 systems.
According to the actual engineering plan, the Abis E1 cable has two types: 75
Ω
E1 cable
for Abis and 120
Ω
E1 cable for Abis.
The E1 cable for Abis is the 16-core PCM outdoor cable.
shows its
appearance.
Figure 5-32 E1 Cable
1.
Waterproof washer
2.
End A label
3.
Fixing block
4.
End B label
describes the E1 cable for Abis of the corresponding relationship between the
core and the signal.
Table 5-8 Description of Cores of E1 Cable for Abis
Core Color
Signal
Core Color
Signal
Blue/Red1
TX0+
Grey/Red1
TX2+
Blue/Black1
TX0-
Grey/Black1
TX2-
Pink/Red1
RX0+
Blue/Red2
RX2+
Pink/Black1
RX0-
Blue/Black2
RX2-
Green/Red1
TX1+
Pink/Red2
TX3+
Green/Black1
TX1-
Pink/Black2
TX3-
Yellow/Red1
RX1+
Green/Red2
RX3+
Yellow/Black1
RX1-
Green/Black2
RX3-
Steps
1.
Bind the cable tie at the bottom of the cable rack corresponding to the E1 (E1/T1)
interface.
2.
Make the E1 cable pass through the cable tie, tighten it to the cable rack, and fasten
the cable tie.
5-37
SJ-20101104174421-001|20110425(R1.1)
ZTE Proprietary and Confidential
Содержание ZXSDR BS8908 G060
Страница 5: ...Glossary V III ...
Страница 6: ...IV ...
Страница 78: ...Tables This page intentionally left blank ...