Confidential and Proprietary Information of ZTE NETVIEW
9
C h a p t e r 2
Installation
This chapter introduces the installation of NCN 2XXX-EP(B)(C)
brick IP camera, including installation preparation, preparation
of connecting cables, cabling requirement and installation
method.
Precautions
Please check complete articles against the packing list
carefully after unpacking.
Please read this chapter carefully before installation.
Please turn off the power of the device before you start
installation.
Please check the supply voltage to avoid device being
damaged due to unmatched voltage.
Do not use the device where it would be subject to extreme
temperature or humidity. Keep the device in a place with good
ventilation, and keep it away from liquid splashing or violent
vibration.
If the device does not work normally, please contact your
dealer, instead of dismantling or repairing it. The company
will not be reliable for any damages resulted in unauthorized
repairing or maintenance.
Power and Grounding Requirements
Power requirement: DC12V±10%, 2.5A.
Содержание NCN 2001-EPI/CE
Страница 9: ...This page is intentionally blank ...
Страница 35: ......
Страница 79: ......
Страница 83: ......
Страница 99: ......