Receiving, Inspection & Assembly
4
Figure 3-1.
System Unpacked and Ready for Assembly.
Assembly
To assemble the unpacked System, follow these steps in the indicated order.
Hook
1.
Attach the gray hook to the front of the mast using the short bolt
provided. Use a 7/64-inch Allen wrench to tighten the bolt securely (see
figure 3-2).
Figure 3-2.
System With Hook Attached.
600479-001 Rev 2 28/147
Содержание CoolGard 3000
Страница 1: ...Operation Manual 600479 001 Rev 2 1 147...
Страница 4: ...Safety Information 1 Safety Information 600479 001 Rev 2 4 147...
Страница 13: ...Introduction 1 Introduction 600479 001 Rev 2 13 147...
Страница 25: ...Receiving Inspection Assembly 1 Receiving Inspection Assembly 600479 001 Rev 2 25 147...
Страница 32: ...Operation 1 Operation 600479 001 Rev 2 32 147...
Страница 95: ...Accesories HMIA 1 Hospital Monitor Interface Accessory HMIA 600479 001 Rev 2 95 147...
Страница 109: ...TempTrend CSV 1 TempTrend CSV 600479 001 Rev 2 109 147...
Страница 120: ...Alarms Corrective Actions 1 Alarms Corrective Actions 600479 001 Rev 2 120 147...
Страница 125: ...Troubleshooting 1 Troubleshooting 600479 001 Rev 2 125 147...
Страница 131: ...Maintenance 1 Maintenance 600479 001 Rev 2 131 147...
Страница 140: ...Warranty Service 1 Warranty Service 600479 001 Rev 2 140 147...
Страница 145: ...Specifications 1 Specifications 600479 001 Rev 2 145 147...