Operation
37
Figure 4-41. Lift the Pump Rollers Handle.
11.
Place the flanged connector of the pump tubing into the slot on the right
side of the pump head.
1. Place flanged connector
into socket on right hand
side of pump raceway.
Figure 4-42. Flanged Connector Fits Into Recess.
12.
Load the pump tubing around the rollers and into the channel of the
pump head. You must turn the handle counterclockwise as you feed the
tubing into the channel. Press down firmly on the tubing until it settles
into the bottom of the channel. Once the tubing is installed, press the
handle down onto the rollers until it presses into its detent.
600479-001 Rev 2 68/147
Содержание CoolGard 3000
Страница 1: ...Operation Manual 600479 001 Rev 2 1 147...
Страница 4: ...Safety Information 1 Safety Information 600479 001 Rev 2 4 147...
Страница 13: ...Introduction 1 Introduction 600479 001 Rev 2 13 147...
Страница 25: ...Receiving Inspection Assembly 1 Receiving Inspection Assembly 600479 001 Rev 2 25 147...
Страница 32: ...Operation 1 Operation 600479 001 Rev 2 32 147...
Страница 95: ...Accesories HMIA 1 Hospital Monitor Interface Accessory HMIA 600479 001 Rev 2 95 147...
Страница 109: ...TempTrend CSV 1 TempTrend CSV 600479 001 Rev 2 109 147...
Страница 120: ...Alarms Corrective Actions 1 Alarms Corrective Actions 600479 001 Rev 2 120 147...
Страница 125: ...Troubleshooting 1 Troubleshooting 600479 001 Rev 2 125 147...
Страница 131: ...Maintenance 1 Maintenance 600479 001 Rev 2 131 147...
Страница 140: ...Warranty Service 1 Warranty Service 600479 001 Rev 2 140 147...
Страница 145: ...Specifications 1 Specifications 600479 001 Rev 2 145 147...