Unpacking Procedures Warning
13
Zolix Instruments Co., Ltd.
http://www.zolix.com.cn E-mail:[email protected]
The current value of the light source is set by the current adjusting knob, and is observed on the current display
table. After reaching the set value, the button is pressed again to display the actual current value state
3. Press start switch and output current to light.
(
2
)
Front panel interface connection light source operation method:
1. Connect the power supply line, the front panel output positive and negative poles connected to the light
source, closed the main switch, front panel display voltage and current value and work status indicator. Notice
that the 1 and 2 pin interfaces of the connector on the rear panel must be short circuited, otherwise the power
supply will be protected.
2. Press the setting / actual current switch to make the Set light on. Press the power inside / outside control
button to the indicator light Local, indicating that the current is adjusted by the panel current adjustment knob.
The current value of the light source is set by the current adjusting knob, and is observed on the current display
table. After reaching the set value, the button is pressed again to display the actual current value state.
3. Press the soft start switch and output current to light the light.
(
3
)
Operation method of light source controlled by external voltage input:
1. Connecting the power supply line, the front panel or rear panel standard interface can be used to connect the
light source, and the main switch is closed. The front panel displays the voltage current value and the working
status indicator.
2. Press the current inside / outside the selection, to the indicator Remote indicator light, access to 0~5V
external input control side, through the external regulation of the control current output.
3. Press the soft start switch and output current to light the light.
(
4
)
Switch operation of external control power supply:
1. Before the machine is energized, switch the power switch of the rear panel to the "EXT" position. And
connect the rear external control BNC cable
。
2. Powering the machine
3. Setting current according to the above current settings
4. After the external control BNC cable input +5V, light source start, fan work; input 0V, light source closed,
fan continue to work for 5 minutes; 5 minutes after the fan closed, at this time the BNC input +5V, the light
source can start again. When the light source is closed less than 5 minutes, that is, when the fan is still working,
restart again invalid.
5 Unpacking Procedures
(1)
Visual examination
Please do the following inspection for all packing box
Check whether the packaging is intact outside the equipment, there are
situations, such as damage, soaks, out of shape, etc..
Have above-mentioned situation please report immediately to Zolix. Or
Representatives
(2)
Unpacking procedures
Please open the packing box and make sure Do-Not uses the heavy-duty tool
or opens rudely. With the proper tool according to the direction shown on the
packing box so as not to cause inside equipment to be damaged.
(3)
After unpacks
Please check equipment have appearance damage or corrosion, etc..