if local code allows it.)
PIPING
STEP 4
2)
While
1)
the discharge pipe, position and mark the location of
the pump unit discharge
3)
Cut and
1-1/2" (DN40) vent pipe as required to ensure that
the
pipe does not interfere with other components. Make the
connection to the pump unit with the provided street elbow.
A 2" x 1" 90° discharge
has been provided.
Proper venting is required.
4)
Temporarily set the toilet in place to check that there is no piping
interference. Remove the toilet and set it aside.
5)
Clean, prime and solvent weld the discharge piping and pump unit
discharge
When applying solvent weld to discharge
ensure that
none gets into the check valve assembly. Pay close attention to the proper
alignment of the discharge
previously marked.
6)
For markets requiring a pipe vent, clean and solvent weld the vent piping
as required for proper venting.
Cut and
the pipe and
as required for 1" (DN25)
diameter discharge pipe (may be reduced to 3/4" [DN20] diameter
Once the side inlet opening has been drilled out, remove burrs
dry-fit
fittings
dry-fitting
dry-fit
fitting.
fitting
vent
and rough edges to avoid the potential for clogging.
© Copyright 2020 Zoeller Co. All rights reserved.
- 7 -
Note:
Adding other bathroom fixtures - The Qwik Jon® Premier is designed to
accept additional bathroom fixtures utilizing the two side inlets. These inlets can be
attached via the 2" NPT (outside diameter) or the 1-1/2" (DN40) slip (inside diameter).
These inlets must have the inner portion drilled out using a 1-3/4" (44 mm) hole saw.
This is to ensure there is no leakage problems from inlets not in use. When utilizing
side inlets, install a check valve on the incoming line.