background image

1

INSTALLATION INSTRUCTIONS

RECOMMENDED MODELS

P/N 151797

Notice to installing contractor:  Instructions must remain with installation.

FM2676

0419

Supersedes

0117

PREINSTALLATION CHECKLIST - ALL INSTALLATIONS

DATE INSTALLED:

MODEL NUMBER:

1.   Inspect your pump. Occasionally, products are damaged during shipment.  If the unit is damaged, contact your dealer before using. DO NOT remove the test plugs in the cover nor the 

motor housing.

2.   Carefully read the literature provided to familiarize yourself with specific details regarding installation and use. These materials should be retained for future reference.

EFFLUENT*/SUMP/DEWATERING SEWAGE

53

®

 / 57 Series, 98 Series

264 Series

137 Series, 151 / 152 / 153 Series

266 / 267 Series

CAUTION

SEE BELOW FOR

LIST OF CAUTIONS

SEE BELOW FOR

LIST OF WARNINGS

 

1.   Make certain that the receptacle is within the reach  of the pump’s power supply cord.  

DO NOT USE AN EXTENSION CORD. Extension cords that are too long or too light do not 

deliver sufficient voltage to the pump motor, and they could present a safety hazard if the 

insulation were to become damaged or the connection end were to fall into a wet or damp 

area.

  2.  

Make sure the pump electrical supply circuit is equipped with fuses or circuit breakers 

of proper capacity.

 A separate branch circuit is recommended, sized according to the 

“National Electrical Code” for the current shown on the pump nameplate.

  3.  

Testing for ground. 

As a safety measure, each electrical outlet should be checked for 

ground using an Underwriters Laboratory Listed circuit analyzer which will indicate if the 

power, neutral and ground wires are correctly connected to your outlet.  If they are not, call 

a qualified, licensed electrician.

  4.  

For Added Safety. 

 Pumping and other equipment with a 3-prong grounded plug must be 

connected to a 3-prong grounded receptacle. For added safety the receptacle may be 

protected with a ground-fault circuit interrupter. When a pump needs to be connected in 

a watertight junction box, the plug can be removed and spliced to the supply cable with 

proper grounding. For added safety this circuit may be protected by a ground-fault circuit 

interrupter. The complete installation must comply with the National Electrical Code and 

all applicable local codes and ordinances.

 5. 

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE 

HANDLING.

  Single phase pumps are supplied with a 3-prong grounded plug to help protect 

you against the possibility of electrical shock.  

DO NOT, UNDER ANY CIRCUMSTANCES, 

REMOVE THE GROUND PIN.

 The 3-prong plug must be inserted into a mating 3-prong 

grounded receptacle.  If the installation does not have such a receptacle, it must be changed 

to the proper type, wired and grounded in accordance with the National Electrical Code 

and all applicable local codes and ordinances.  Three phase pumps require motor starting 

devices with motor overload protection. See FM0486 for duplex installations.

  6.  The tank is to be vented in accordance with local plumbing code.  Pumps 

must

 be installed in 

accordance with the National Electrical Code and all applicable local codes and ordinances.  

Pumps are not to be installed in locations classified as hazardous in accordance with 

National Electrical Code, ANSI/NFPA 70.

 7. 

Risk of electrical shock.

 Do not remove power supply cord and strain relief or connect 

conduit directly to the pump.

  8.  Installation and servicing of electrical circuits and hardware should be performed by a 

qualified licensed electrician.

  9.  Pump installation and servicing  should be performed by a qualified person.

 10.  Risk of electrical shock - These pumps have not been investigated for use in swimming 

pool and 

marine areas.

 11.  Prop65 Warning for California residents: Cancer and Reproductive Harm- www.P65Warnings.

ca.gov.

  1.  Check to be sure your power source is capable of handling the voltage requirements of 

the motor, as indicated on the pump name plate.

  2.  The installation of automatic pumps with variable level float switches or nonautomatic pumps 

using auxiliary variable level float switches is the responsibility of the installing party and 
care should be taken that the tethered float  switch will not hang up on the pump apparatus 

or pit peculiarities and is secured so that the pump will shut off.  It is recommended to use 

rigid piping and fittings and the pit be 18" (46 cm) or larger in diameter.

 3. 

Information - vent hole purpose. 

 It is necessary that all submersible sump, effluent, and 

sewage pumps capable of handling various sizes of solid waste be of the bottom intake design 
to reduce clogging and seal failures.  If a check valve is incorporated in the installation, 

a vent hole (approx. 3/16" [5 mm]) must be drilled in the discharge pipe below the check 

valve and pit cover to purge the unit of trapped air. Trapped air is caused by agitation and/
or a dry basin.  Vent hole should be checked periodically for clogging.  The 53

®

 / 57, and 

98 Series pumps have a vent located in the pump housing opposite the float, adjacent to 

a housing lug, but an additional vent hole is recommended.  The vent hole on a High Head 
application may cause too much turbulence. You may not want to drill one. If you choose 
not to drill a vent hole, be sure the pump case and impeller is covered with liquid before 
connecting the pipe to the check valve and no inlet  carries air to the pump intake. NOTE: 
THE HOLE MUST ALSO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. 
Water stream will be visible from this hole during pump run periods.

  4.  Pump should be checked frequently for debris and/or buildup which may interfere with 

the float “on” or “off” position. Repair and service should be performed by Zoeller Pump 

Company Authorized Service and Warranty Center.

  5.  Dewatering and effluent sump pumps are not designed for use in pits handling raw sewage.
  6.  Maximum operating temperature for standard model pumps must not exceed 130 °F (54 

°C).  

  7.  Pump models 266, 267, and 137 must be operated in an upright position. Do not attempt to 

start pump when tilted or laying on its side.

  8.  Do not operate a pump in an application where the Total Dynamic Head is less than the 

minimum Total Dynamic Head listed on the Pump Performance Curves.

REFER TO WARRANTY ON PAGE 2.

NOTE: Pumps with the “UL” mark and pumps with the “US” mark are tested to UL Standard 

UL778. CSA Certified pumps are certified to CSA Standard C22.2 No. 108.

Product information presented 

here reflects conditions at time 

of  publication. Consult factory 

regarding discrepancies or 

inconsistencies.

MAIL TO

:  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO

:  3649 Cane Run Road  • Louisville, KY  40211-1961

TEL

: (502) 778-2731 • 1 (800) 928-PUMP • 

FAX

: (502) 774-3624

Visit our web site:

zoellerpumps.com

* Effluent systems should specify that pumps should not handle solids exceeding 3/4” (19.1 mm) in order to prevent large solids from entering leeching fields, mound systems, etc.  (Model 49 

Series has 3/8” [9.5 mm] solids capability.  50, 90, and 151 Series have 1/2” [12.7 mm], 130 Series has 5/8” [15.9 mm], 152 and 153 models have 3/4” [19.1 mm].)  Where code permits, sewage 

pumps can be used for effluent systems.  Nonautomatic pumps with external-level controls are recommended for septic tank effluent applications.

NOTICE: VENT HOLE FOR

CHECK VALVE

SEE #3 IN CAUTION SECTION

BELOW AND #4 ON PAGE 3

© Copyright 2019 Zoeller

®

 Co. All rights reserved.

Register your 

Zoeller Pump Company 

Product on our website:

http://reg.zoellerpumps.com/

Содержание 53 Series

Страница 1: ...hese pumps have not been investigated for use in swimming pool and marine areas 11 Prop65WarningforCaliforniaresidents CancerandReproductiveHarm www P65Warnings ca gov 1 Check to be sure your power so...

Страница 2: ...Zoeller Authorized Service and Warranty Centers Go to www zoellerpumps com to find the Authorized Service Center in your area SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING A SUMP PUMP 1 DO read...

Страница 3: ...on front page Water stream will be visible from this hole during pump run periods 5 Securely tape or clamp power cord to discharge pipe clear of the float mechanism s 6 Use full size discharge pipe 7...

Страница 4: ...tion All three phase pumps require motor starting devices with motor overload protection See FM0486 for duplex installations Pumps must be installed in accordance with the National Electrical Code and...

Страница 5: ...usar tuber a y empalmes r gidos y que el foso tenga 45 cm 18 pulg o m s de di metro 3 Informaci n Objetivo del agujero de ventilaci n Es necesario que todas las bombas sumergibles de sumidero efluent...

Страница 6: ...de retenci n y una uni n en la tuber a de descarga JAM S use una tuber a de descarga de menor tama o que la descarga de la bomba 7 JAM S use una bomba de sumidero como una bomba excavadora o para zanj...

Страница 7: ...herm ticos contra gases son necesarios a fin de contener los gases y olores 13 Ventile los gases y olores a la atm sfera a trav s del tubo de ventilaci n Debe cumplir con los c digos locales pero no e...

Страница 8: ...quite el cable de alimentaci n el ctrica ni el dispositivo de alivio de tensi n y no conecte un conductor directamente a la bomba ADVERTENCIA La instalaci n y verificaci n de los circuitos el ctricos...

Страница 9: ...tallateur est responsable de l installation des pompes automatiques avec des interrupteurs niveauvariableoudespompesnon automatiquesutilisantdesinterrupteurs auxiliaires niveau variable et il doit s a...

Страница 10: ...qui varient d une province l autre GARANTIE LIMIT E Le fabricant garantit l acheteur et au propri taire ult rieur pendant la p riode de garantie tout produit neuf contre tout vice de mat riel et de m...

Страница 11: ...s r glements applicables 8 Avantlamiseenservice lapompedoit tredeniveauetlem canismeduflotteur ne doit pas toucher les bords du puits 9 Apr s l installation le puits doit tre propre et ne doit pas con...

Страница 12: ...ache Plage de pompage 5 10 15 20 22 9 13 5 18 22 24 127 mm 5 po min 559 mm 22 po max SK305 Interrupteur 20 amps mod les WD et WH min max 011835 Instructions de branchement triphas AVERTISSEMENT POUR D...

Отзывы: