BG2000 Series Barrier Gate (APP Version)
User Manual
P a g e
| 10
Copyright©2022 ZKTECO CO., LTD. All rights reserved.
6
Installation Procedure
Installation Precautions
•
Install the parking barrier on a flattened ground. A cement foundation is required before
installation if the ground is not solid and flat.
•
It is possible to reduce the length of the boom arm, but it cannot be increased. After the boom arm
has been cut, it is important to set the spring balance again to achieve a new balance. The bottom
of the spring contains two plastic nuts designed to adjust the new balance.
•
When powered on, do not change the wire connection inside.
•
Connect the GND to the cabinet for ensured protection.
Cable Embedding
1.
a cable are required.
2.
The route cables must pass through the protective sleeves.
3.
Use a tool to open the cable tray on the ground.
Boom Arm Installation
6.3.1
Boom Arm Installation Procedure
1.
Place the boom into the boom tray head according to the hole location.
2.
Use the spanner to clamp the round boom by screws, gasket, and screws nuts.