S
martLPR
®
Access User Manual
Installation
Quercus Technologies
29
Place the assembly obtained on the vertical
pole.
4.1.2. Common procedures
This section describes all the procedures common to all the installation methods of the camera
housing models (ceiling, wall, mast, floor, etc.).
1. Connect the network cable.
2. Connect the power supply cable.
3. Connect the input/outputs cable (if needed).
4.2. Wiring and pinouts
This section describes all the steps you need to follow in order to make the cables (power, digital
I/O-if necessary-, and the network cable) used in both cabinet and camera housing installation.
4.2.1 Making the cables
Steps for assembling the DC power cable:
Remove the cable gland from the main body of the
connector
Содержание SmartLPR Access
Страница 21: ...SmartLPR Access User Manual Installation Quercus Technologies 22 ...
Страница 35: ...SmartLPR Access User Manual Configuration Quercus Technologies 36 Configuration ...
Страница 42: ...SmartLPR Access User Manual Advanced Concepts Quercus Technologies 43 Advanced concepts ...
Страница 48: ...SmartLPR Access User Manual Annexes Quercus Technologies 49 Annexes ...
Страница 60: ...SmartLPR Access User Manual Annexes Quercus Technologies 61 R D Director ...
Страница 62: ...SmartLPR Access User Manual Annexes Quercus Technologies 63 ...