Instructions for Installation and Use of the C3­100/200/400 Control Panel 

28 

distribution).  Metal  hoses  are  applicable  to  ceiling  wiring,  but  must  be 

secure and good­looking. 

 

Shielding  measures  and  shielding  connection:  If  the  electromagnetic 

interference in the wring environment is found strong in the survey before 

construction,  it  is  necessary  to  consider  shielding  protection  for  data 

cables  when  designing  a  construction  scheme.  Overall  shielding 

protection is required if there is a large radioactive interference source or 

wiring  has  to  be  parallel  with  a  large­current  power  supply  on  the 

construction  site.  Generally,  shielding  measures  include:  keeping  a 

maximum  distance  from  any  interference  source,  and using  metal wiring 

troughs  or  galvanized  metal  water  pipes  to  ensure  reliable  grounding  of 

the  connection  between the  shielding layers  of  data  cables  and the  metal 

troughs  or  pipes.  Note  that  a  shielding  enclosure  can  have  a  shielding 

effect only when it is grounded reliably. 

 

Ground wire connection method: Reliable large­diameter ground wires in 

compliance  with  applicable  national  standards  are  needed  on  the  wiring 

site,  and  should  be  connected  in  a  tree  form  to  avoid  DC  loop.  These 

ground  wires  must  be  kept  far  away  from  lightning  fields.  No  lightning 

conductor  can  serve  as  a  ground  wire,  and  ensure  there  is  no  lightning 

current  through  any  ground  wire  when  there  is  lightning.  Metal  wiring 

troughs  and  pipes  must  be  connected  continuously  and  reliably,  and 

linked  to  ground  wires  through  large­diameter  wires.  The  impedance  of 

this section of wire cannot exceed 2ohm. The shielding layer also must be 

connected reliably, and grounded at one end to guarantee uniform current 

direction.  The  ground  wire  of  the  shielding  layer  must  be  connected 

through a large­diameter (not smaller than 2.5mm 

) wire.

Содержание C3-100

Страница 1: ...100 200 400 Control Panel Version 1 0 1 Date Oct 2010 About This Manual This manual is a guide to installation and connection of the C3 100 200 400 access control operator panel For how to use the sof...

Страница 2: ...llation 8 3 2 Installation of Access Control Operator Panel Wires 9 3 3 Control Operator Panel System Installation 10 3 4 Control Operator Panel Connection Terminals 12 3 5 Connection with Door Sensor...

Страница 3: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel II 4 4 DIP Switch Setting 485 Address Setting Factory Setting and Terminal Resistance Setting 31...

Страница 4: ...ase lest the equipment should fall and get damaged and more undesirably cause severe personal injuries Therefore it is important to install the equipment as instructed by the manufacturer 4 All periph...

Страница 5: ...use only the substitutes specified by the manufacturer 9 Security inspection After the equipment is repaired the repair personnel are supposed to conduct security inspection to ensure the equipment ca...

Страница 6: ...round but the heights are subject to proper adjustment according to customers usual practice 7 It is advised to install control panels at places easy of maintenance like a weak electric well 8 It is s...

Страница 7: ...with the system with the electronic lock to release the self induced electromotive force during onsite connection for application of the access control system 14 It is recommended that an electronic...

Страница 8: ...m of 30 000 card holders and 100 000 offline event records Support of multiple Wiegand card formats and a password keypad compatible with various types of cards Use of dual communication technologies...

Страница 9: ...106mm width for C3 400 External box dimensions 345mm 275mm 70mm 2 3 Control Operator Panel Indicators When the C3 100 200 400 is powered on normally the POWER indicator red is lit constantly the RUN i...

Страница 10: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 7 See the C4 indicators in the following figure Figure 2 1 Indicators in the C3 400...

Страница 11: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 8 3 Connection and Installation 3 1 Case Installation...

Страница 12: ...Wire Installation Diagram Notes 1 Before connection make sure the power supply is disconnected because connection with power connected will cause severe damage to the equipment 2 The access control wi...

Страница 13: ...Printer Card issuer C3 400 control operator panel Internal button Card reader 1 Card reader 2 Card reader 3 Card reader 4 Controlling one way entry exit of four doors Controlling two way entry exit of...

Страница 14: ...networks On a 485 bus each management workstation can be connected with up to 63 C3 control operator panels preferably fewer than 32 The communication wires should be kept away from high voltage wire...

Страница 15: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 12 3 4 Control Operator Panel Connection Terminals C3 100 terminal connection diagram...

Страница 16: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 13 C3 200 terminal connection diagram...

Страница 17: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 14 C3 400 terminal connection diagram...

Страница 18: ...ls mentioned above are set through relevant access control software Please see the respective software instructions for details Ports on the C3 control operator panel No Functional Port C3 100 One Doo...

Страница 19: ...se the interlock function Exit switch An exit switch is a switch installed indoors to open a door When it is switched on the door will be opened An exit button is fixed at a height of about 1 4m above...

Страница 20: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 17 Figure 3 3 Connections between C3 400 and Door Sensors Exit Switches and Auxiliary Input Devices...

Страница 21: ...door two way mode C3 200 provides four readers which can be connected in the two door two way mode C3 400 provides four readers which can be connected in the two door two way or four door one way mod...

Страница 22: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 19 Figure 3 4 Connection between C3 400 and Readers...

Страница 23: ...he following illustrates relay output connection with an example of door connection 1 An access control operator panel provides multiple electronic lock outputs The COM and NO terminals are applicable...

Страница 24: ...electronic lock at the instant of switching off on it is necessary to connect a diode in parallel please use the FR107 delivered with the system with the electronic lock to release the self induced el...

Страница 25: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 22 3 Dry mode External power supply for NO Lock 4 Dry mode External power supply for NC Lock...

Страница 26: ...for Installation and Use of the C3 100 200 400 Control Panel 23 5 Dry mode The system control the Normally Open lock use the switch value 6 Dry mode The system control the Normally Close lock use the...

Страница 27: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 24...

Страница 28: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 25 3 8 Access Control Operator Panel System Power Supply Structure 220V AC...

Страница 29: ...parately When high reliability is required control panels and electronic locks should be powered respectively To prevent power failure of a control operator panel from making the whole system unable t...

Страница 30: ...during an action on other elements 4 core wires RVV 4 0 75mm2 two for a power supply and two for a door sensor are recommended 5 Other control cables like exit switches are all made of 2 core wires R...

Страница 31: ...e connection between the shielding layers of data cables and the metal troughs or pipes Note that a shielding enclosure can have a shielding effect only when it is grounded reliably Ground wire connec...

Страница 32: ...rted Printer Management host Card issuer Hub TCP IP Ethernet C3 control panel C3 control panel C3 control panel Figure 4 1 TCP IP Communication System Networking 4 3 RS485 Network Communication 1 RS48...

Страница 33: ...s is longer than 300 meters one 120ohm resistance is usually inserted between the first and last access control operator panels on the RS485 bus 4 For this access control operator panel putting place...

Страница 34: ...the switch is set downwards it indicates 0 off For example to set a device number 39 1 2 4 32 which corresponds to the binary code 111001 put places 1 2 3 and 6 to the ON position as illustrated belo...

Страница 35: ...OFF 20 OFF OFF ON OFF ON OFF 21 ON OFF ON OFF ON OFF 22 OFF ON ON OFF ON OFF 23 ON ON ON OFF ON OFF 24 OFF OFF OFF ON ON OFF 25 ON OFF OFF ON ON OFF 26 OFF ON OFF ON ON OFF 27 ON ON OFF ON ON OFF 28...

Страница 36: ...N ON 49 ON OFF OFF OFF ON ON 50 OFF ON OFF OFF ON ON 51 ON ON OFF OFF ON ON 52 OFF OFF ON OFF ON ON 53 ON OFF ON OFF ON ON 54 OFF ON ON OFF ON ON 55 ON ON ON OFF ON ON 56 OFF OFF OFF ON ON ON 57 ON OF...

Страница 37: ...F position the factory settings will be restored after the access control operator panel is restarted Terminal resistance setting Place 8 is for setting the RS485 termination resistance Putting the sw...

Отзывы: