background image

Instructions for Installation and Use of the C3­100/200/400 Control Panel 

12 

3.4 Control Operator Panel Connection Terminals

 

C3­100 terminal connection diagram

Содержание C3-100

Страница 1: ...100 200 400 Control Panel Version 1 0 1 Date Oct 2010 About This Manual This manual is a guide to installation and connection of the C3 100 200 400 access control operator panel For how to use the sof...

Страница 2: ...llation 8 3 2 Installation of Access Control Operator Panel Wires 9 3 3 Control Operator Panel System Installation 10 3 4 Control Operator Panel Connection Terminals 12 3 5 Connection with Door Sensor...

Страница 3: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel II 4 4 DIP Switch Setting 485 Address Setting Factory Setting and Terminal Resistance Setting 31...

Страница 4: ...ase lest the equipment should fall and get damaged and more undesirably cause severe personal injuries Therefore it is important to install the equipment as instructed by the manufacturer 4 All periph...

Страница 5: ...use only the substitutes specified by the manufacturer 9 Security inspection After the equipment is repaired the repair personnel are supposed to conduct security inspection to ensure the equipment ca...

Страница 6: ...round but the heights are subject to proper adjustment according to customers usual practice 7 It is advised to install control panels at places easy of maintenance like a weak electric well 8 It is s...

Страница 7: ...with the system with the electronic lock to release the self induced electromotive force during onsite connection for application of the access control system 14 It is recommended that an electronic...

Страница 8: ...m of 30 000 card holders and 100 000 offline event records Support of multiple Wiegand card formats and a password keypad compatible with various types of cards Use of dual communication technologies...

Страница 9: ...106mm width for C3 400 External box dimensions 345mm 275mm 70mm 2 3 Control Operator Panel Indicators When the C3 100 200 400 is powered on normally the POWER indicator red is lit constantly the RUN i...

Страница 10: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 7 See the C4 indicators in the following figure Figure 2 1 Indicators in the C3 400...

Страница 11: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 8 3 Connection and Installation 3 1 Case Installation...

Страница 12: ...Wire Installation Diagram Notes 1 Before connection make sure the power supply is disconnected because connection with power connected will cause severe damage to the equipment 2 The access control wi...

Страница 13: ...Printer Card issuer C3 400 control operator panel Internal button Card reader 1 Card reader 2 Card reader 3 Card reader 4 Controlling one way entry exit of four doors Controlling two way entry exit of...

Страница 14: ...networks On a 485 bus each management workstation can be connected with up to 63 C3 control operator panels preferably fewer than 32 The communication wires should be kept away from high voltage wire...

Страница 15: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 12 3 4 Control Operator Panel Connection Terminals C3 100 terminal connection diagram...

Страница 16: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 13 C3 200 terminal connection diagram...

Страница 17: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 14 C3 400 terminal connection diagram...

Страница 18: ...ls mentioned above are set through relevant access control software Please see the respective software instructions for details Ports on the C3 control operator panel No Functional Port C3 100 One Doo...

Страница 19: ...se the interlock function Exit switch An exit switch is a switch installed indoors to open a door When it is switched on the door will be opened An exit button is fixed at a height of about 1 4m above...

Страница 20: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 17 Figure 3 3 Connections between C3 400 and Door Sensors Exit Switches and Auxiliary Input Devices...

Страница 21: ...door two way mode C3 200 provides four readers which can be connected in the two door two way mode C3 400 provides four readers which can be connected in the two door two way or four door one way mod...

Страница 22: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 19 Figure 3 4 Connection between C3 400 and Readers...

Страница 23: ...he following illustrates relay output connection with an example of door connection 1 An access control operator panel provides multiple electronic lock outputs The COM and NO terminals are applicable...

Страница 24: ...electronic lock at the instant of switching off on it is necessary to connect a diode in parallel please use the FR107 delivered with the system with the electronic lock to release the self induced el...

Страница 25: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 22 3 Dry mode External power supply for NO Lock 4 Dry mode External power supply for NC Lock...

Страница 26: ...for Installation and Use of the C3 100 200 400 Control Panel 23 5 Dry mode The system control the Normally Open lock use the switch value 6 Dry mode The system control the Normally Close lock use the...

Страница 27: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 24...

Страница 28: ...Instructions for Installation and Use of the C3 100 200 400 Control Panel 25 3 8 Access Control Operator Panel System Power Supply Structure 220V AC...

Страница 29: ...parately When high reliability is required control panels and electronic locks should be powered respectively To prevent power failure of a control operator panel from making the whole system unable t...

Страница 30: ...during an action on other elements 4 core wires RVV 4 0 75mm2 two for a power supply and two for a door sensor are recommended 5 Other control cables like exit switches are all made of 2 core wires R...

Страница 31: ...e connection between the shielding layers of data cables and the metal troughs or pipes Note that a shielding enclosure can have a shielding effect only when it is grounded reliably Ground wire connec...

Страница 32: ...rted Printer Management host Card issuer Hub TCP IP Ethernet C3 control panel C3 control panel C3 control panel Figure 4 1 TCP IP Communication System Networking 4 3 RS485 Network Communication 1 RS48...

Страница 33: ...s is longer than 300 meters one 120ohm resistance is usually inserted between the first and last access control operator panels on the RS485 bus 4 For this access control operator panel putting place...

Страница 34: ...the switch is set downwards it indicates 0 off For example to set a device number 39 1 2 4 32 which corresponds to the binary code 111001 put places 1 2 3 and 6 to the ON position as illustrated belo...

Страница 35: ...OFF 20 OFF OFF ON OFF ON OFF 21 ON OFF ON OFF ON OFF 22 OFF ON ON OFF ON OFF 23 ON ON ON OFF ON OFF 24 OFF OFF OFF ON ON OFF 25 ON OFF OFF ON ON OFF 26 OFF ON OFF ON ON OFF 27 ON ON OFF ON ON OFF 28...

Страница 36: ...N ON 49 ON OFF OFF OFF ON ON 50 OFF ON OFF OFF ON ON 51 ON ON OFF OFF ON ON 52 OFF OFF ON OFF ON ON 53 ON OFF ON OFF ON ON 54 OFF ON ON OFF ON ON 55 ON ON ON OFF ON ON 56 OFF OFF OFF ON ON ON 57 ON OF...

Страница 37: ...F position the factory settings will be restored after the access control operator panel is restarted Terminal resistance setting Place 8 is for setting the RS485 termination resistance Putting the sw...

Отзывы: