ASSEMBLY
ZIPPER MASCHINEN GmbH www.Zipper-Maschinen.at
20
ZI-COM100-2V5
18
ASSEMBLY
18.1
Checking scope of delivery
Check the machine immediately after delivery for transport damage and missing parts..
18.2
Setting up the device
Place the machine on a solid surface. A concrete floor is the best foundation for the machine. The space
required by the machine and the required load capacity of the ground result from the technical data
(dimensions, weight) of your machine. Observe the local safety regulations when designing the working
area around the machine. When dimensioning the required space, take into account that operation,
maintenance and repair of the machine must be possible at all times without restriction. The selected
installation site must ensure a suitable connection to the electrical mains.
18.3
Assembly
The machine comes pre-assembled and only the parts disassembled for transport must be assembled
according to the following instructions:
1.
Assembly the wheels
Fasten the wheel with threaded shaft to the
machine using washers and nuts.
2.
assembly rubber feet
Attach rubber feet to machine with nut.
3.
assembly drain screw
Install the condensation drain screw on the
bottom of the vessel by screwing it into the
existing hole.
4.
Assembly air filter
Assemble the two air filters (1) as shown.
Remove any dummy cover in advance.
5.
Assembly oil vent valve
Install the oil vent valve (2) as shown.
Remove any dummy cover in advance.