6.4  Configuring the setpoint 

Always open the valves in lines before or after the pressure regulator slowly and avoid pressure shocks! 

 

Spring-loaded model ZM-R und LPR: 

Slowly open the valve or ball valve before or after the pressure regulator and set it to a small flow of approx. 1 to 2 

Nm³/h. 

Set the desired pressure by turning the setting screw (6 mm hexagon socket). 

Warning! Observe the maximum values on the nameplate. 

Clockwise rotation = Decreasing secondary pressure p

2

 

Counterclockwise rotation = Increasing secondary pressure p

2

 

 

Dome-loaded model (ZM-R/D and LPR/D): 

With an additional pilot controller, the dome pressure can be set to the desired value. Up to 1000 mbar and/or 2000 

mbar of dome pressure is permissible depending on the device type. Precise adjustments can also be made via the 

setting screw on the spring dome. 

7  Impulse line (C-connection) 

An impulse line must be able to communicate with the p

1

 side of the valve under any circumstances. Accordingly, no 

valves or other flow resistances may be present in the secondary, non-turbulent flow area between the device and 

impulse line pickup. Otherwise, the device is not functional and may even be destroyed. 

 

If the impulse line is not connected, there is also a risk of damaging or destroying the devices, depending on the inlet 

pressure. 

 

For 

ZM-R15, ZM-R25 

device types, an impulse line (G1/4 connection) is recommended if: 

-  P

1

 ≥ 8 bar at Kv 0.65 

-  P

1

 ≥ 4 bar at Kv 1.25 

-  Generally for Kv 2 and 2.5 

 

Connection  

≥ 

300 mm from the center of the device 

(or directly at the process for longer lines) 

 

 

An impulse line must not be tapped in a turbulent zone. 

 

For 

LPR

, the impulse line is optional and is not required for standard applications.

 

8  Maintenance and repairs 

The previously mentioned pressure regulators work without auxiliary energy and are maintenance-free. Additional 

queries may be processed only by specifying the serial number. 

 

The serial number must be specified for spare part orders.  

 

Device returns for repair or modification can be accepted only if they have been cleaned and have a completed RMA 

according to the applicable regulations. In the case of hazardous media, we recommend returning the device 

disassembled and cleaned. 

8.1  Inspection intervals 

An annual review of the function or maintenance is recommended depending on the characteristics of the medium and 

the respective operating states. Depending on these results, the testing/maintenance interval can be shortened or 

extended by the operator/user. 

 

 

 

Содержание LPR Series

Страница 1: ...1 Intended use 2 3 2 Assembly work on the pressure regulator 2 4 Safety provisions 3 5 Material resistance 3 6 Startup 3 6 1 Before installation 3 6 2 Installation 3 6 3 Assembly position and install...

Страница 2: ...replacing parts and or for procuring spare parts 3 Purpose These type of pressure regulators are suitable for various tasks e g inerting containers with inactive gases The degree of protection for th...

Страница 3: ...l test The resistance of the materials has to be checked see the corresponding chapter of this operating manual Newly installed pipelines must be fully rinsed clean to eliminate mechanical residues It...

Страница 4: ...ight outlet piping of 10 x DN on the secondary side is recommended Furthermore it is recommended that you install one shut off valve each before and after the pressure regulator to simplify any mainte...

Страница 5: ...not functional and may even be destroyed If the impulse line is not connected there is also a risk of damaging or destroying the devices depending on the inlet pressure For ZM R15 ZM R25 device types...

Страница 6: ...g La pression primaire se situe 2 bar g max 10 bar g p1 bar g p2 mbar g Werkstoff Material of construction Mat riaux de construction Welcher Werkstoff ist ausreichend chemisch best ndig Edelstahl Has...

Страница 7: ...ar ZM R ZM R D max 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 2...

Страница 8: ...ax 2524 mbar 0 10 50 100 200 N A 5 5 mbar ZM R N ND NDs min 1000 mbar 11 0 mbar 15 3 mbar ZM R N ND NDs min 1000 mbar 56 6 mbar 60 10 mbar ZM R N ND NDs min 1000 mbar 116 16 mbar 120 20 mbar ZM R N ND...

Страница 9: ...LPRK D Ds max 1000 mbar 24 104 mbar 16 100 mbar LPRK LPRK D Ds max 1000 mbar 34 200 mbar 30 200 mbar LPRK LPRK D Ds max 1000 mbar 34 500 mbar2 3 30 500 mbar2 3 LPRK LPRK D Ds max 1000 mbar 10 50 100...

Страница 10: ...mbar 6 16 mbar 2 12 mbar LPR LPR D max 2016 mbar 7 26 mbar 3 22 mbar LPR LPR D max 2026 mbar 9 64 mbar 5 60 mbar LPR LPR D max 2064 mbar 14 124 mbar 10 120 mbar LPR LPR D max 2124 mbar 19 224 mbar 15...