background image

6

DDOC001

12 / h

EN / 2020-01-15

Zimmer GmbH 

 Im Salmenkopf 5 

 

 77866 Rheinau, Germany 

 

 +49 7844 9138 0 

●  

 +49 7844 9138 80 

 www.zimmer-group.com

INSTALLATION AND OPERATING INSTRUCTIONS:

 

Manual tool changers, HWR series 

6.  Function

The tool changer is a two-piece machine element. Install the fixed part 

1

on a handling system. Install the loose part 

3

directly on the tool. The two elements are positively connected using the locking bolts 

7

.

The manually rotatable devices 

2

and 

6

create the required stroke. After being locked, the locking lever 

2

is folded 

up completely and therefore does not create any interference contours. A fixed part 

1

 can be operated with as many 

loose parts as desired. That significantly reduces set-up times during tool exchanges.

Fig. 1: HWR series tool changer

Fig. 2: Cutaway view of the HWR series tool changer

6.1  Technical data

INFORMATION:

For information on technical data, please visit our website.

This data varies within the series, depending on the specific design. 

Zimmer Customer Service is available to provide you with assistance if you have any further questions.

1

Fixed part

2

Locking lever

3

Loose part

4

Robot flange

5

Integrated pneumatic feed-through, 

6xM5

6

Interlock cam

7

Locking bolt

8

Mounting surface for the energy element

Содержание HWR Series

Страница 1: ...INSTALLATION AND OPERATING INSTRUC TIONS HWR series Manual tool changers DDOC00112 THE KNOW HOW FACTORY www zimmer group com...

Страница 2: ...DDOC00112 h EN 2020 01 15 Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 49 7844 9138 80 www zimmer group com INSTALLATION AND OPERATING INSTRUCTIONS Manual tool changers HWR series...

Страница 3: ...pe plate 5 6 Function 6 6 1 Technical data 6 7 Installation 7 7 1 General installation information 7 7 2 Installation of the mechanical system 7 7 3 Installation of accessories 8 8 Setting the clampin...

Страница 4: ...ose a hazard the tool changer is not properly installed used or maintained the tool changer is not used for its intended purpose local regulations legislation ordinances guidelines such as the EC Mach...

Страница 5: ...irect contact with perishable goods food is not permitted 4 Personnel qualification Installation commissioning and maintenance may only be performed by specialists These personnel must have read and u...

Страница 6: ...2is folded up completely and therefore does not create any interference contours A fixed part 1can be operated with as many loose parts as desired That significantly reduces set up times during tool e...

Страница 7: ...movement of the machine or system into which the tool changer is to be installed Switch off the power supply to the machine before all work Secure the machine against being switched on unintentionall...

Страница 8: ...GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 49 7844 9138 80 www zimmer group com INSTALLATION AND OPERATING INSTRUCTIONS Manual tool changers HWR series 7 3 Installation of accessories...

Страница 9: ...With flat plug 32 pin WER2000 pneumatic transmission element With 6 connections M5 Loose part 3 6 pneumatic connections bowith M5 threads 6 pneumatic connections tubeless with O rings bq 2 connecting...

Страница 10: ...part must be 0 0 mm A gap between the fixed and the loose part indicates that inside the element the end face of the clamping sleeve btof the loose part 3and of the clamping ring brof the fixed part 1...

Страница 11: ...on the clamping mechanism 3 4 revolution of the clamping nut 0 75 mm height adjustment on the clamping mechanism 1 2 revolution of the clamping nut 0 50 mm height adjustment on the clamping mechanism...

Страница 12: ...ries NOTICE The pitch of the clamping nut is 1 mm 1 revolution of the clamping nut 1 00 mm height adjustment on the clamping mechanism 3 4 revolution of the clamping nut 0 75 mm height adjustment on t...

Страница 13: ...t 3 Lower the fixed part 1 If there are any additionally mounted energy elements see accessories watch closely to make sure the coupling is clean The fixed part and the loose part must be completely f...

Страница 14: ...of the tool changer must be made only using the original packaging If the tool changer has already been installed on the superordinate machine unit you must ensure that no uninten tional movements can...

Страница 15: ...Hoch See manufacturer s address Rheinau Germany 2020 01 15 Martin Zimmer First name last name Address Place and date of issuance Legally binding signature Managing Partner 15 REACH declaration In ter...

Страница 16: ...rements No 1 1 2 No 1 1 3 No 1 1 5 No 1 3 1 No 1 3 2 No 1 3 4 No 1 3 7 No 1 5 1 No 1 5 3 No 1 5 4 No 1 6 4 No 1 7 1 No 1 7 3 DIN EN ISO 12100 2011 03 Safety of machinery General principles for design...

Отзывы: