MAN 06-0015: Rev. A
Page 3
Z I E H M V I S I O N I N S TA L L AT I O N M A N U A L I n s ta l l a t i o n
Caution:
Do not attempt to move the monitor assembly by your self.
3. There are four screw holes located on the bottom of the monitor
case. Attach the monitor case to the cart with four allen screws.
4. Route the mobile cart wiring through the hole in the bottom of the
monitor case.
5. Connect the AC power cords and video BNC connectors to their
respective monitors (left and right).
6. Connect the
CAN-BUS cables
to the RJ45 connector on the CAN
module boards on each monitor.
7. Attach the ground wires to the rear panel and cart.
8. Apply power to the C-Arm and Monitor Cart and verify that the
system works properly. Test All functions. If the system is set-up to
be non-fluoroscopic, then confirm that it cannot produce radiation.
9. Re-attach the rear panels and access plates
Содержание VISION
Страница 1: ...s Ziehm VISION Installation Manual and CDRH Report...
Страница 5: ...Table of Contents Page 2 MAN 06 0015 Chapter Rev A...
Страница 9: ...ZIEHM VISION INSTALLATION MANUAL Mounting Page 4 MAN 06 0015 Rev A 2 2...
Страница 12: ...MAN 06 0015 Rev A Page 7 ZIEHM VISION INSTALLATION MANUALInstallation This page is intentionally blank...
Страница 13: ...ZIEHM VISION INSTALLATION MANUAL CDRH Report Page 8 MAN 06 0015 Rev A...
Страница 51: ...Ziehm Imaging Inc Vision Installation Manual MAN 06 0015 Rev A Page 38 Maintenance Report Mechanical...