10
INSTALLATION
– FLAMME INBUILT ONLY
Refer to clearances as specified on the following pages and select a position for your heater.
Allow for clearances in roof for flue system. Ensure heater is clear of any combustible materials
within specified clearances.
Install the flue through roof to manufacturer’s specifications to comply with the latest version of
AS/NZS 2918. The heater must be installed by a certified installer.
CAVITY DIMENSIONS
Locate the timber frame around the heater. You will need to adhere to the clearance dimensions
below. The timber frame shown below is an example only.
Ventilation to the enclosure is required for
air flow into the enclosure.
Air vents can be placed on the side of the
enclosure or on the front. The diagram
shows the air vents on the side.
The vents at the bottom need to be a
minimum
of
10,000
mm²,
with
no
restrictions, such as louvres (a 10,000 mm²
opening is equivalent to 100 mm x 100 mm.
AIR VENT
AIR VENT
TOP VIEW
Содержание FLAMME
Страница 6: ...6 INSTALLATION GENERAL NOTES ...
Страница 24: ...24 ELECTRICAL DIAGRAM ...