![Zeversolar Zeverlution 1000S Скачать руководство пользователя страница 24](http://html2.mh-extra.com/html/zeversolar/zeverlution-1000s/zeverlution-1000s_assembly-installation-and-operating-instructions_3582575024.webp)
Installation and Operating Instructions V03
23
Procedure:
1.
Switch off the miniature circuit-breaker and secure it against being inadvertently
switched back on.
2.
Loosen the screws of the cover using a screwdriver (T25) and remove the cover.
3.
Strip the AC cable insulation. Strip the insulation of L, N, and PE by 12 mm each.
Shorten L and N by 10 mm more than PE.
4.
Route the AC cable into the inverter through the M20 cable gland.
5.
If necessary, slightly loosen the swivel nut of the cable gland.
6.
Insert bared conductor into the cord end terminal and crimp the contact.
7.
Connect the AC cable to the screw terminal block, using a flat-blade screwdriver
(blade: 1×5.5) with a torque of 1.2 to 1.5Nm.
loosen the screws of the cover
• During loosening the screws of the cover, it is not necessary to take
off the screws and conical spring washers, which can remain on the
cover and will not fall off.
70mm
12mm