![Zeversolar Zeverlution 1000S Скачать руководство пользователя страница 18](http://html2.mh-extra.com/html/zeversolar/zeverlution-1000s/zeverlution-1000s_assembly-installation-and-operating-instructions_3582575018.webp)
Installation and Operating Instructions V03
17
3.
Holding the inverter and attach it tilted slightly downwards to the wall bracket.
4.
Check both sides of the heatsink to ensure that it is securely in place.
5.
Push the inverter as far as possible and attach it to both sides of the wall bracket
using the M5 screws.
If a second protective conductor is required in installation site, ground the inverter
and secure it so that it cannot be lifted off the wall bracket (see section 5.4.3
‛Second protective grounding connection“).
Dismante the inverter in reverse order.