Installation Requirement
System:
• The unit is a high-pressure hydraulic system, hence all hydraulic fittings to be ensured tight. Do not tamper with
these fittings
• Unit is not to be kept in closed environment. Sufficient ventilation is required. Avoid any kind of high impact on
the unit
Electrical Requirements:
• 230V +10%, 5A socket with proper earthing to be made available at the point of installation
-
• Ensure that a voltage stabilizer is installed where the mains voltage variation is more than 230V AC + 10%.
-
Also ensure adequate earthing on voltage stabilizer
Plumbing Requirements:
2
2
•
½
” water line with minimum of 0.5 kg/cm pressure and maximum of 2 - kg/cm pressure
• Drainage line is required within a distance of 1 meter from the unit
• Ball valve & Hose a adopter (Provided with the unit)
• Ensure that the raw water quality meets the specification
Precautions in Installing The Unit:
A. Location of the unit
• Find out a suitable position for installing the Zero B Sapphire / Emerald on the wall
• Locate the Zero B Sapphire / Emerald so as to have easy access to dispensing. Preferably with the base of the
Zero B Sapphire / Emerald at 4 feet height from ground
• Zero B Sapphire / Emerald should be located close to an available tap or water outlet (not exceeding 1 meter length)
• A pre-filter along with inlet drain has to be located over a drainage point such as sink in the kitchen
• Zero B Sapphire / Emerald should be located conveniently where the power outlet of 230V AC is available
• The reject line on the pre-filter is free falling water line, avoid connecting any tube over this port
Note: A constant flow from the reject line during tank filling is an indication of proper purification