4. Insert the bottom support frame
into the top support frame. Fig.3
Adjust height according to your in-
stallation (see pag.16) and secure
the support frames together using
the (2) screws per extension arm (8
total). Fig.4
5. Insert the motor housing into the support frame assembly and secure it using
8 screws. Fig.5
6. Connect the equipment to the power supply by following the steps shown in
the section
POWER SUPPLY CONNECTION
.
NOTE
: For the various installations use screws and screw anchors suited to the
type of ceiling (minimum screw size: 1/4" diameter x 2-3/4" length).
- 18 -
Содержание VISTA ISLAND DVL-E36ASSX
Страница 2: ......
Страница 10: ...front of hood side of hood top of hood Hood Specifications 10...
Страница 24: ...Wiring Diagram INTERNAL BLOWER CIRCUIT DIAGRAM 24...
Страница 25: ...Wiring Diagram REMOTE BLOWER CIRCUIT DIAGRAM 25...
Страница 37: ...Partie avant de la hotte Partie sup rieure de la hotte Partie lat rale de la hotte Specifications Techniques 37...
Страница 51: ...Sch ma de c blage SCH MA DU CIRCUIT DE MOTEUR INTERIEUR 51...
Страница 52: ...Sch ma de c blage SCH MA DU CIRCUIT DE MOTEUR EXTERIEUR 52...
Страница 55: ......