background image

Size (UNC 

Recommended 

Alloy Steel)

Torque (in-lbs)

1/2-13

922

9/16-12

1,331

5/8-11

1,836

3/4-10

3,257

7/8-9

5,800

1-8

8,000

1 1/8-7

12,000

10

Reassembly
continued

Bolt Torque

Size (UNC 

Recommended 

Alloy Steel)

Torque (in-lbs)

#8-32

30

#10-24

43

#10-32

49 (UNF thread)

1/4-20

103

5/16-18

213

3/8-18

378

7/16-14

605

PEP-II 
ISO View

Clockwise rotation, pressure building pump shown (standard).

ring on the shaft with the ID tapering
toward the pump. On the drive shaft ends,
fit the bullnose on the end of the shaft.
Work the seal gently over the end of the
bullnose and down the shaft, as any dam-
age could cause polymer leakage after
start-up. Ease the seal into the wide end
of the installation ring and, using the
pressing tool, gently press the lip seal into
the Rheoseal housing. Do not attempt to
press on the lip seal with screwdriver or
other pointed object, as this will damage
the seal. Do not press the lip seal all the
way into its cavity. Instead, allow it to 
protrude slightly so that it will be correctly
seated by the seal cover. Carefully
remove the special Zenith tools.

14) Slide the seal cover over the shaft

until it rests on the protruding lip seal.
Align the screw holes in the cover with
those in the housing and insert the
screws. Tighten them evenly in a criss-
cross pattern so that the seal is slowly
pressed into the seal housing. When the
cover is touching the housing all the way
around, remove the seal cover and torque
the seal housing bolts down. Reinstall the
seal cover on the shaft and torque it
down. In reinstalling the pump, be certain
to follow the instructions given in the
Installation section of this manual.

Содержание Pumps

Страница 1: ...Zenith Pumps Installation Care and Maintenance Zenith Polymer Extrusion Gear Pumps PEP II Series Gear Pumps...

Страница 2: ...critical issues in the diverse plastics industry The Zenith gear pump optimizes the extrusion process by allowing the screw to melt and homogenize the polymer As the pump generates the needed pressur...

Страница 3: ...and bottom of the center plate for the mounting of heat plates and for the mounting of the pump to its stand Thermocouple wells 1 8 27 NPT are located on the body of the pump A Zenith Rheoseal assembl...

Страница 4: ...1 KEY EXTERNAL PUMP PUMP DIMENSIONS MAX APPROX CAPACITY A B C D E F G H I J TORQUE WEIGHT 0 16 3 000 3 000 2 860 1 400 2 400 1 960 0 750 1 4 1 500 0 125 80 9 0 3 3 000 3 000 2 860 1 400 2 400 1 960 0...

Страница 5: ...I J TORQUE WEIGHT 5 3 250 3 250 3 250 1 125 2 875 2 125 0 500 1 4 1 875 0 750 1225 10 10 4 000 4 000 4 000 1 188 3 375 2 615 0 625 5 16 2 344 1 000 2085 18 20 4 750 5 000 5 000 1 188 3 750 3 300 0 75...

Страница 6: ...ture thread lubricant such as DAG Dispersion 154 Felpro C 100 or equivalent 2 Place the top heat plate on the pump then place the insulation jacket on top of the heat plate Install and tighten the bol...

Страница 7: ...nces As with any other Zenith pumps PEP II pumps may be returned to Zenith for complete rehabilitation as necessary This procedure may be desirable if only a few pumps are involved If a large number o...

Страница 8: ...te assembly Again soaking the parts in lubricating penetrating oil or other non damaging solution will help ease the disassembly Do not force the parts out one side with a hammer or arbor press 7 Slid...

Страница 9: ...he driven shaft taking care to select a bearing with the proper groove configuration Set the flats on the circum ference of the bearings against each other and gently slide the bearings and shafts int...

Страница 10: ...gently press the lip seal into the Rheoseal housing Do not attempt to press on the lip seal with screwdriver or other pointed object as this will damage the seal Do not press the lip seal all the way...

Страница 11: ...rrent and speed settings Check all drive couplings 3 Process conditions changed Check process conditions for proper melt temperature pres sures viscosities and materials 4 Entrained particle Disassemb...

Страница 12: ...y of operating conditions and applications for these products or systems the user through its own analysis and testing is solely responsible for making the final selection of the products and systems...

Отзывы: